Laserfiche WebLink
Walter Limon <waiter.Iimon@gmail.com> <br />RE: Zewdu AFH Conversion 1202 E Casino RD, Everett - Engineering Approval <br />Required <br />messaa- <br />Kyriakos Moroseos <kam@cdengr.com> Fri, Nov 8, 2024 at 9:39 AM <br />To: Walter Limon <walter.limon@gmail.com>, ermias hailu <ermias@emddesignpractice. corn > <br />Cc: Bernard We Build <bernardwebuild@gmail.com> <br />Hi Walter, <br />We are ok with this. Adding the additional 2x is acceptable. <br />Thanks, <br />iI Kyriakos Moroseos, PE <br />Principal Structural Engineer <br />I: V'-• i ()M DESIGN 6 EN6NEEMNO. INC <br />(425) 268-5946 <br />kam@cdengr.com <br />www.cdengr.com <br />From: Walter Limon <walter.limon@gmail.com> <br />Sent: Thursday, November 7, 2024 1:06 PM <br />To: Kyriakos Moroseos <kam@cdengr.com>; ermias hailu <ermias@emddesignpractice. com> <br />