My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
818 105TH PL SE B 2025-05-13
>
Address Records
>
105TH PL SE
>
818
>
818 105TH PL SE B 2025-05-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 3:27:39 PM
Creation date
4/25/2025 8:44:47 AM
Metadata
Fields
Template:
Address Document
Street Name
105TH PL SE
Street Number
818
Unit
B
Permit
2024005074
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Utility Patching Streets -Asphalt <br />Work Order ID: 2024005074 <br />EVERETT <br />Address: 818 105Th PI Se Unit B <br />Priority: <br />Zone: Water Distribution <br />Status: Records Review <br />....................................................................................................................................... <br />Category: corrective Maintenance <br />Details: <br />Initiated By: Bigley, Ryan <br />Initiated Date: 86I8I2024 12:21:54PM <br />Requested By: Spooner, James <br />Supervisor: Hale, Michael <br />Submit To: Weese, Jayson <br />Submit to Data: 8I2612O24 1:30:12PM <br />Projected Stan:]I3I2024 9:GoNAM <br />Projected Finish: 7M202411:00:51AM <br />Actual Star- 7/3/2024 9:00:57AM <br />Actual Finish: 71N2024 11:00:02AM <br />Completed By: Weese, Jayson <br />Closed By: <br />Closed Date: <br />Account 401 000005710119564 <br />Location Details: 818105TH PL BE UNIT <br />Custom Fields: <br />Asphalt (Tons): 1 25 <br />Square Feet Patched. <br />100 <br />Customers: <br />ID Customer <br />Address Home Phone Cell Phone Call Date <br />........... ............. <br />Instructions: <br />......... .......... _. _.. _. _. _... ........ ...................... <br />Please replace asphalt aaces <br />street 20h x 30In x 4-Inches <br />....................................................................................................................................... <br />Assets: <br />Tvoe <br />Asset ID MIDI Location <br />CENTERLINES <br />0 <br />....................................................................................................................................... <br />Cost Summary: <br />Labor Cost <br />$474.19 <br />Equipment Cost: <br />$248.92 <br />Material Cost <br />$0.00 <br />Total Cost: <br />$723.11 <br />Labor: <br />Internal <br />Page 1 of 3 <br />3�025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.