Laserfiche WebLink
PUBLIC WORKS PERMIT Date Applied: 8/30/2022 <br /> 1112 <br /> City of Everett Permit Services Public Works Permit#: PW2208-019 <br /> 3200 Cedar Street, 2nd Floor Associated Bldg Permit#: B2207-004 <br /> EVERETT <br /> Everett, WA 98201 Planning Reference#: REV122-100 <br /> WASHINGTON everettwa.gov/permits Public Works Fee: $765.00 <br /> PermitServices@everettwa.gov Schedule Inspections at:onlinepermits.everettwa.gov <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> COMMUNITY TRANSIT MATT COVERT <br /> 7100 HARDESON RD <br /> EVERETT,WA 98203 <br /> PHONE:4253671972 PHONE:4258929574 <br /> SITE ADDRESS:2501 W CASINO RD TAX PARCEL ID#:28041400201800 <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> DESCRIPTION: EARLY CLEARING AND GRADING FOR PROPOSED VEHICLE STORAGE&TR <br /> PERMIT CONDITIONS: <br /> 1. All inspections shall be scheduled online at https//onlinepermits everettwa.gov.Available inspection dates are shown in the dropdown menu. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and Specifications for <br /> Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans and drainage report approved by the City of Everett Public Works Department dated 08/30/2022.Approved <br /> plans must remain on job-site at all times. <br /> 5. It is the applicant/contractor's responsibility to ensure coverage under Ecology's Construction Stormwater General Permit is obtained and <br /> maintained throughout the entire construction duration. <br /> 6. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally request all <br /> required inspections.An Inspection Handout is provided at permit issuance with instructions on how to request an inspection online. <br /> 7. Install and maintain erosion control measures per City of Everett Standards and per the direction of the PW Inspector and the approved <br /> SWPPP/TESC Plan. Remove upon completion of the project prior to final approval of the permit. <br /> 8. Keep City streets clean at all times.No dirt, mud,rocks,or debris to be tracked onto roadway. <br /> 9. Protect all existing underground utilities(to remain)during construction. <br /> 10.All excavated material shall be hauled to an approved,permitted site. <br /> 11.Prior to any interruption to the public right-of-way(roadways,parking lanes,or sidewalks)a haul route will be required to be submitted to the <br /> City of Everett prior to permit issuance.Contact the Traffic Engineering Department for Street Use Permits and any required Oversize Load Permits <br /> at 425-257-8810(press Option 7 for Traffic). <br /> 12.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy Request a final inspection online by selecting PW <br /> 25-Site Final/Permit Close Out within the Online Permitting Portal Inspection Requests when all items have been completed for this permit. <br /> Public Works Permit Fee Breakdown: <br /> Erosion Control $200.00 <br /> Grade/Fill/Excavate(20150CY) $525.00 <br /> PW Plan Review $20.00 <br /> PW Site Inspection $20.00 <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> By purchasing this permit and commencing work,the owner/applicant hereby agrees to hold and save harmless the City of Everett from any and all <br /> claims for damages,costs,expenses,or causes of action that may arise because of installation and maintenance of the improvement or other right- <br /> of-way use here to applied for and further agrees to remove same upon notice from the City and to replace public property damaged thereby. <br /> VALIDITY/EXPIRATION: <br /> Work authorized by this permit must be started within 180 days of date permit is issued and thereafter is to be diligently pursued to completion.This <br /> permit may be cancelled by the city upon any stoppage of work on this project over 180-day duration.Each inspection extends the expiration date <br /> 180 days to keep the permit open while work is active <br /> Page 1 of 1 <br /> APPLICANT/JOB SITE COPY TREASURER ADDRESS FILE <br />