My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Accord Contractors 4/16/2025
>
Contracts
>
Agreement
>
Other Services Agreements
>
Accord Contractors 4/16/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2025 1:29:07 PM
Creation date
4/25/2025 1:28:35 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Accord Contractors
Approval Date
4/16/2025
Department
Finance
Department Project Manager
Bert Cueva
Subject / Project Title
Bert Cueva
Tracking Number
0004798
Total Compensation
$26,033.11
Contract Type
Agreement
Contract Subtype
Other Services Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
1 <br />SERVICES AGREEMENT <br /> <br />This Services Agreement (“Agreement”) is effective as of the date of the last signature below and <br />is between the City of Everett, a Washington municipal corporation (the “City”), and Service Provider <br />identified in the Basic Provisions below (“Service Provider”). This Agreement is for the purpose of the <br />Service Provider providing the services as set forth in this Agreement. This Agreement includes and <br />incorporates the Basic Provisions, the attached General Provisions, and the documents listed as <br />Agreement Documents in the Basic Provisions. <br />BASIC PROVISIONS <br />Solicitation Concrete Bridge Pieces Loading, Hauling and Offloading <br />Service Provider <br />Accord Contractors LLC <br />12826 SE 40th LN Ste 204 <br />Bellevue, WA 98006 <br />keith@accordcontractors.com <br />City Project <br />Manager <br />Lance Husby <br />City of Everett – Public Works <br /> <br />3200 Cedar Street <br />Everett, WA 98201 <br />lhusby@everettwa.gov <br />Brief Summary of <br />Work <br />Loading, Hauling, and Offloading eighteen (18) bridge pieces from Lowell <br />Riverfront Park to the City Storage Yard. <br />Completion Date June 6, 2025
The URL can be used to link to this page
Your browser does not support the video tag.