Laserfiche WebLink
24459OW 00 Date Exported: 3/30/22 <br />1.40 <br />1.30 <br />1.20 <br />a <br />a <br />`o <br />1.10 <br />c <br />a <br />a <br />a 1.00 <br />L <br />UO <br />a <br />x <br />`a 0.90 <br />0.80 <br />0.70 <br />0.60 <br />2/15/22 7:12 <br />2/15/22 8:24 2/15/22 9:36 2/15/22 10:48 2/15/22 12:00 2/15/22 13:12 2/15/22 14:24 2/15/22 15:36 2/15/22 16:48 <br />Notes: <br />1. PIT-1 was completed on February 15, 2022. <br />2. After approximately 7 hours the remaining water in the test pit was removed by bailing in order to facilitate <br />over -excavation of the test pit. <br />3. The testing phase head range was analyzed during the testing period. <br />PIT-1 Hydrograph <br />7800 Evergreen Way <br />Everett, Washington <br />GEOENGINEERFigure <br />