My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7800 EVERGREEN WAY HYUNDAI 2025-08-05
>
Address Records
>
EVERGREEN WAY
>
7800
>
HYUNDAI
>
7800 EVERGREEN WAY HYUNDAI 2025-08-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2025 2:25:26 PM
Creation date
4/28/2025 2:17:04 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
7800
Tenant Name
HYUNDAI
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. Identify public streets and highways serving the site or affected geographic area and <br /> describe proposed access to the existing street system. Show on site plans, if any. <br /> See Site plan for Additional Information <br /> b. Is the site or affected geographic area currently served by public transit? If so, generally <br /> describe. If not, what is the approximate distance to the nearest transit stop? <br /> Public Bus Stop Emediate Adjacent, See Site plan for Additional Information <br /> c. How many additional parking spaces would the completed project or non-project proposal <br /> have? How many would the project or proposal eliminate? <br /> No Change Proposed <br /> d. Will the proposal require any new or improvements to existing roads, streets, pedestrian, <br /> bicycle or state transportation facilities, not including driveways? If so, generally describe <br /> (indicate whether public or private). <br /> None Expected <br /> e. Will the project or proposal use (or occur in the immediate vicinity of)water, rail, or air <br /> transportation? If so, generally describe. <br /> N/A <br /> f. How many vehicular trips per day would be generated by the completed project or proposal? <br /> If known, indicate when peak volumes would occur and what percentage of the volume would <br /> be trucks (such as commercial and nonpassenger vehicles). What data or transportation <br /> models were used to make these estimates? <br /> No change expected <br /> g. Will the proposal interfere with, affect or be affected by the movement of agricultural and <br /> forest products on roads or streets in the area? If so, generally describe. <br /> None Expected <br /> h. Proposed measures to reduce or control transportation impacts, if any: <br /> None Expected <br /> 15. Public Services 'help' <br /> a. Would the project result in an increased need for public services (for example: fire protection, <br /> police protection, public transit, health care, schools, other)? If so, generally describe. <br /> None Expected <br /> b. Proposed measures to reduce or control direct impacts on public services, if any. <br /> None Expected <br /> 16. Utilities jhelpl <br /> a. Circle utilities currently available at the site: <br /> le ectricity, natura gas, water, re use service, to ephone, sanitary sewer, septic system, <br /> other <br /> SEPA Environmental checklist(WAG 197-11-960) July 2016 Page 11 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.