Laserfiche WebLink
Dose the litre poMol graft as Row Coal sane(per MR sap <br /> Yes N. <br /> q • <br /> Ns <br /> Did M protect deeelaper choose lo meet Dose tie protect upper <br /> to LID Perlorrrorioe Elsowant7 writ Mlb h-167(Per (M Wad e M the woad ands <br /> Me Proled Thresholds n AMb t1•p) Me UGA on a pros <br /> N. of rrl is S ewes or hose Minweasi, <br /> Ves Seas* <br /> REQUIRED:For each <br /> shafaw.consider he IMP. sae <br /> In Me In order laid LM tJ -fie N. <br /> for lad type of surface Use V <br /> Ole Ltl IMP Mee le Old Vie want <br /> considered ueet ie dnrda I-choose lo <br /> meet the LD V <br /> NOT REQUIRED' Prfoerorroe Old Me poled <br /> Adlewseid of Me UO Blsriderd7 dseekpr choose so <br /> Perbmwwe Isriderd. yie noel Me LD <br /> Performance <br /> Banderol? <br /> Ves <br /> REOUNED:For sedi Vas <br /> swan wader Me NO <br /> IMP,n 1e ardor <br /> ease nUMtl for Mat <br /> type M solace.Use <br /> Mia OM IMP wet e <br /> aoneidred feedON. <br /> NOT REQUIRED <br /> Adiswnrd alien UD <br /> Perbmenoe IlrMerd. <br /> L <br /> —1 REQUIRED:Meet Me UD <br /> REQUIRED;Meet Mie LID Performance REQUIRED:For seen Parlor,risrioe&sridre Mr0111f1 <br /> shim"Mrarph Mie use or in,Flow Crrsal surf as consider the OAPs pre use of env Flow Carol <br /> IMP(s)n M~in n the order lead n Lit 12 IMP(s)In tie main <br /> for that type of surface.Use <br /> REQUIRED:Apply IMP T5.13 RIM Me aril IMP Met M REQUIRED Ppplp IMP T5.13 <br /> Conseueem Sol Dually said Depth considered teseEls POM•Corrinidon Sod Only <br /> rid DpR <br /> NOT REQUIRED:Applywo Me IMPs n Uses NOT REQUIRED. <br /> It,e2,or 03. Achievement al Ie LID NOT REQUIRED*POOR the <br /> PSAmmriw slsndrd. IMPS in Life at.R,or p <br /> Flow Chart for Determining MR#5 <br /> Requirements <br /> DEPARTMENT OF Renal March 2019 <br /> ECOLOGY Pleas„e ratp,hwww icy es powtop,1i tlIe,ir for carotin nasos ninny prrtieslorrs. <br /> sate of Washington wawa of lily,and awarmr <br /> Figure 3-2: Flow Chart for Determining MR#5 Requirements <br /> As described in Section 4, flow control will be provided for the new roof area by a StormChamber detention <br /> system and for the disturbed area (through an in-kind area swap) by an R-Tank full-infiltration system. While <br /> the StormChamber detention system does not meet the LID performance standard for the new roof alone, <br /> analyzed as part of the entire project, the flow control provided by both systems meets the LID performance <br /> standard for the project. See Appendix B for a combined model of both flow control systems analyzed for the <br /> entire project area. <br /> MINIMUM REQUIREMENT 6: RUNOFF TREATMENT <br /> This project proposes construction of over 5,000 square feet of new or replaced pollution generating <br /> impervious surface area and is subject to enhanced runoff treatment per preapplication meeting with the City <br /> of Everett,August 17th, 2021. Enhanced treatment will be provided for the disturbed area (through an in-kind <br /> area swap) by a proprietary Biopod water quality system.As the proposed Biopod system is a unit with surface <br /> intake (BPT-412lB), the online design discharge rate will be used. Water quality is not required for runoff from <br /> the new roof area. <br /> LMJ Hyundai—Showroom Remodel <br /> 5 <br />