My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7800 EVERGREEN WAY HYUNDAI Drainage Report 2025-04-28
>
Address Records
>
EVERGREEN WAY
>
7800
>
HYUNDAI
>
Drainage Report
>
7800 EVERGREEN WAY HYUNDAI Drainage Report 2025-04-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2025 2:44:55 PM
Creation date
4/28/2025 2:43:07 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
7800
Tenant Name
HYUNDAI
Address Document Type
Drainage Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dose the litre poMol graft as Row Coal sane(per MR sap <br /> Yes N. <br /> q • <br /> Ns <br /> Did M protect deeelaper choose lo meet Dose tie protect upper <br /> to LID Perlorrrorioe Elsowant7 writ Mlb h-167(Per (M Wad e M the woad ands <br /> Me Proled Thresholds n AMb t1•p) Me UGA on a pros <br /> N. of rrl is S ewes or hose Minweasi, <br /> Ves Seas* <br /> REQUIRED:For each <br /> shafaw.consider he IMP. sae <br /> In Me In order laid LM tJ -fie N. <br /> for lad type of surface Use V <br /> Ole Ltl IMP Mee le Old Vie want <br /> considered ueet ie dnrda I-choose lo <br /> meet the LD V <br /> NOT REQUIRED' Prfoerorroe Old Me poled <br /> Adlewseid of Me UO Blsriderd7 dseekpr choose so <br /> Perbmwwe Isriderd. yie noel Me LD <br /> Performance <br /> Banderol? <br /> Ves <br /> REOUNED:For sedi Vas <br /> swan wader Me NO <br /> IMP,n 1e ardor <br /> ease nUMtl for Mat <br /> type M solace.Use <br /> Mia OM IMP wet e <br /> aoneidred feedON. <br /> NOT REQUIRED <br /> Adiswnrd alien UD <br /> Perbmenoe IlrMerd. <br /> L <br /> —1 REQUIRED:Meet Me UD <br /> REQUIRED;Meet Mie LID Performance REQUIRED:For seen Parlor,risrioe&sridre Mr0111f1 <br /> shim"Mrarph Mie use or in,Flow Crrsal surf as consider the OAPs pre use of env Flow Carol <br /> IMP(s)n M~in n the order lead n Lit 12 IMP(s)In tie main <br /> for that type of surface.Use <br /> REQUIRED:Apply IMP T5.13 RIM Me aril IMP Met M REQUIRED Ppplp IMP T5.13 <br /> Conseueem Sol Dually said Depth considered teseEls POM•Corrinidon Sod Only <br /> rid DpR <br /> NOT REQUIRED:Applywo Me IMPs n Uses NOT REQUIRED. <br /> It,e2,or 03. Achievement al Ie LID NOT REQUIRED*POOR the <br /> PSAmmriw slsndrd. IMPS in Life at.R,or p <br /> Flow Chart for Determining MR#5 <br /> Requirements <br /> DEPARTMENT OF Renal March 2019 <br /> ECOLOGY Pleas„e ratp,hwww icy es powtop,1i tlIe,ir for carotin nasos ninny prrtieslorrs. <br /> sate of Washington wawa of lily,and awarmr <br /> Figure 3-2: Flow Chart for Determining MR#5 Requirements <br /> As described in Section 4, flow control will be provided for the new roof area by a StormChamber detention <br /> system and for the disturbed area (through an in-kind area swap) by an R-Tank full-infiltration system. While <br /> the StormChamber detention system does not meet the LID performance standard for the new roof alone, <br /> analyzed as part of the entire project, the flow control provided by both systems meets the LID performance <br /> standard for the project. See Appendix B for a combined model of both flow control systems analyzed for the <br /> entire project area. <br /> MINIMUM REQUIREMENT 6: RUNOFF TREATMENT <br /> This project proposes construction of over 5,000 square feet of new or replaced pollution generating <br /> impervious surface area and is subject to enhanced runoff treatment per preapplication meeting with the City <br /> of Everett,August 17th, 2021. Enhanced treatment will be provided for the disturbed area (through an in-kind <br /> area swap) by a proprietary Biopod water quality system.As the proposed Biopod system is a unit with surface <br /> intake (BPT-412lB), the online design discharge rate will be used. Water quality is not required for runoff from <br /> the new roof area. <br /> LMJ Hyundai—Showroom Remodel <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.