Laserfiche WebLink
STORMCHAMBER - <br /> DETENTION ONLY <br /> MGS FLOOD <br /> PROJECT REPORT <br /> Program Version: MGSFIood 4.57 <br /> Program License Number: 200410007 <br /> Project Simulation Performed on: 03/29/2022 2:18 PM <br /> Report Generation Date: 03/29/2022 2:18 PM <br /> Input File Name: 2022-03-29 Roof.fld <br /> Project Name: LMJ New Roof <br /> Analysis Title: 2022-03-29 <br /> Comments: <br /> PRECIPITATION INPUT <br /> Computational Time Step (Minutes): 15 <br /> Extended Precipitation Time Series Selected <br /> Climatic Region Number: 15 <br /> Full Period of Record Available used for Routing <br /> Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 <br /> Evaporation Station : 961040 Puget East 40 in MAP <br /> Evaporation Scale Factor : 0.750 <br /> HSPF Parameter Region Number: 1 <br /> HSPF Parameter Region Name : Ecology Default <br /> *******"* Default HSPF Parameters Used (Not Modified by User) *************** <br /> ********************** WATERSHED DEFINITION *********************** <br /> Predevelopment/Post Development Tributary Area Summary <br /> Predeveloped Post Developed <br /> Total Subbasin Area (acres) 0.190 0.190 <br /> Area of Links that Include Precip/Evap (acres) 0.000 0.000 <br /> Total (acres) 0.190 0.190 <br /> SCENARIO: PREDEVELOPED <br /> Number of Subbasins: 1 <br /> Subbasin : Subbasin 1 <br /> Area (Acres) <br /> C, Forest, Flat 0.190 <br /> Subbasin Total 0.190 <br />