Laserfiche WebLink
APPENDIX C <br /> REPORT LIMITATIONS AND GUIDELINES FOR USE1 <br /> This appendix provides information to help you manage your risks with respect to the use of this report. <br /> Geotechnical Services Are Performed for Specific Purposes, Persons and Projects <br /> This report has been prepared for the exclusive use of LMJ Enterprises and other project team members <br /> for the proposed Lee Johnson Hyundai Dealership improvements in Everett, Washington. This report is not <br /> intended for use by others, and the information contained herein is net applicable to other sites. <br /> GeoEngineers structures our services to meet the specific needs of our clients. For example,a geotechnical <br /> or geologic study conducted for a civil engineer or architect may not fulfill the needs of a construction <br /> contractor or even another civil engineer or architect that al involved t the same project. Because each <br /> geotechnical or geologic study is unique, each geotechnical engineerin ; or geologic report is unique, <br /> prepared solely for the specific client and project site. Our report is prepared For the exclusive use of our <br /> Client. No other party may rely on the product of our services unless we agree in ,tdvance to such reliance <br /> in writing. This is to provide our firm with reasonable protection against open-ended claims by third <br /> parties with whom there would otherwise be no contractual limits to their actions. Within the limitations of <br /> scope, schedule and budget, our service h ;eye been executed in accordance with our Agreement with the <br /> Client and generally accepted geotechnic al puctices in this area at the time this report was prepared. This <br /> report should not be applied for any purpos or project except the oil,: originally contemplated. <br /> A Geotechnical Engineering or Geologic Report Is Based on a Unique Set of Project-specific <br /> Factors <br /> This report has been prepared for LMJ Enterprises for the proposed Lee Johnson Hyundai Dealership <br /> improvements in Everett, Washington. GeoEngineers considered a number of unique, project-specific <br /> factors when establishing the scope of services for this proect and report. Unless GeoEngineers specifically <br /> indicates otherwise, do r ;t rely on this report if it was: <br /> • Not prepared for you, <br /> • Not preps=. l for your project, <br /> • Not prepared 1 the specifics ': explored, or <br /> • Completed before i,r portant lot,,i ct changes were made. <br /> For example, changes that cm ni fact the applicability of this report include those that affect: <br /> • The function of the proposed structure; <br /> • Elevation, configuration, location, orientation or weight of the proposed structure; <br /> • Composition of the design team; or <br /> • Project ownership. <br /> 1 Developed based on material provided by ASFE, Professional Firms Practicing in the Geosciences;www.asfe.org. <br /> GEOENGINEERS_O December 6,2021 PageC-1 <br /> File No.24459-003-00 <br />