My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7800 EVERGREEN WAY HYUNDAI O&M Manual 2025-04-28
>
Address Records
>
EVERGREEN WAY
>
7800
>
HYUNDAI
>
O&M Manual
>
7800 EVERGREEN WAY HYUNDAI O&M Manual 2025-04-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2025 2:58:42 PM
Creation date
4/28/2025 2:57:34 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
7800
Tenant Name
HYUNDAI
Address Document Type
O&M Manual
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Isolator Row Inspection/Maintenance <br /> Inspection via a manhole(s) located on the end(s) of the row <br /> The frequency of inspection and maintenance varies for cleanout. If entry into the manhole is required, <br /> by location. A routine inspection schedule needs to please follow local and OSHA rules for a confined <br /> be established for each individual location based space entries. <br /> upon site specific variables. The type of land use Maintenance is accomplished with the JetVac <br /> (i.e. industrial, commercial, residential), anticipated process.The JetVac process utilizes a high pressure <br /> pollutant load, percent imperviousness, climate, water nozzle to propel itself down the Isolator <br /> etc. all play a critical role in determining the actual Row while scouring and suspending sediments. <br /> frequency of inspection and maintenance As the nozzle is retrieved, the captured pollutants <br /> practices. are flushed back into the manhole for vacuuming. <br /> At a minimum, StormTech recommends annual Most sewer and pipe maintenance companies have <br /> inspections. Initially, the Isolator Row should be vacuum/JetVac combination vehicles. Selection of an <br /> inspected every 6 months for the first year of appropriate JetVac nozzle will improve maintenance <br /> operation. For subsequent years, the inspection efficiency. Fixed nozzles designed for culverts or <br /> should be adjusted based upon previous large diameter pipe cleaning are preferable. Rear <br /> observation of sediment deposition. facing jets with an effective spread of at least 45" <br /> The Isolator Row incorporates a combination of are best.JetVac reels can vary in length. For ease <br /> of maintenance, ADS recommends Isolator Row <br /> standard manhole(s) and strategically located lengths up to 200" (61 m). The JetVac process shall <br /> inspection ports (as needed). The inspection ports only be performed on StormTech Isolator Rows <br /> allow for easy access to the system from the surface, that have AASHTO class 1 woven geotextile (as <br /> eliminating the need to perform a confined space specified by StormTech) over their angular base <br /> entry for inspection purposes. stone. <br /> If upon visual inspection it is found that sediment <br /> has accumulated, a stadia rod should be inserted to <br /> determine the depth of sediment. When the average '" <br /> depth of sediment exceeds 3 inches throughout <br /> the length of the Isolator Row, clean-out should be <br /> performed. <br /> Maintenance <br /> • <br /> The Isolator Row was designed to reduce the cost • <br /> of periodic maintenance. By "isolating" sediments <br /> to just one row, costs are dramatically reduced <br /> by eliminating the need to clean out each row of ' ' dob,- <br /> the entire storage bed. If inspection indicates the <br /> potential need for maintenance, access is provided <br /> StormTech Isolator Row(not to scale) <br /> Note: Non-woven fabric is only required over the inlet pipe connection into the end cap for SC-160LP, DC-780, MC <br /> 3500 and MC-7200 chamber models and is not required over the entire Isolator Row. <br /> OPTIONAL INSPECTION PORT <br /> SG-T40.SC-310;COVER ENTIRE ISOLATOR ROW WITH ADS <br /> GEOSYNTHETICS 601T NONWOVEN GEOTEMILE <br /> SC-730'.8'(2 4 m)MIN WIDE ---— <br /> SC-310.5'(1.5 m)MIN WIDE <br /> STORMTECH CHAMBER <br /> MC-4500,MC-7200,DC-T80,SC-160LP;COVER PIPE <br /> CONNECTION TO END CAP WITH ADS <br /> GEOSYNTHETICS 801T NON-WOVEN GEOTEMILE <br /> STORMTECH END CAP <br /> OAMANHOLE <br /> TCH B SIN ap i i'i i' If'' �i1i i !!i 'iI li 1111111 <br /> il' 'i i y <br /> SUMP DEPTH TBD BY <br /> SITE DESIGN ENGINEER <br /> (2,[600 mm)MIN RECOMMENDED) TWO LAYERS OF ADS GEOSYNTHETICS 315WT WOVEN GEOTE%TILE BETWEEN <br /> FOUNDATION STONE ANDNDCHAMBERS CONTINUOUS FABRIC WITHOUT SEAMS <br /> 24'(600 mm)HDPE ACCESS PIPE REQUIRED:MC-7200.MC-35®SC-T40,DC-760 10.3'(3.1 m)MIN WIDE'.MC-7200 <br /> 12'(300 mm)HDPE ACCESS PIPE REQUIRED:SC-310 B.25'(2.5 m)MIN WIDE'.MC <br /> 8'(200 mm)HDPE ACCESS PIPE REQUIRED:SC-160LP 5'(1 5 m)MIN WIDE'.DC-TBO,SC-"!40 <br /> 4'(1.2 m)MIN WIDE:SC-310.SC-160LP <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.