Laserfiche WebLink
SPECIAL INSPECTION DAILY REPORT <br /> Project Information Contract Information <br /> Date: 10/31/2023 Permit No: B2101-014 <br /> Project Name: Four Corners Contract Duration: -- <br /> Project No: 21-1277 Reviewed by: J.McElroy <br /> DFR No: 2023.10.311313 Date Reviewed: l l/1/2023 <br /> Project Location: Everette,WA Revised Duration: -- <br /> Client: Heartland Construction,Inc Contract Calendar Days Used: -- <br /> Contractor: Heartland Construction,Inc Contract Calendar Days Remaining: -- <br /> Work Conditions Inspection Type s / overage <br /> Temperature 46 Documents Referenced: approved plans. <br /> Weather rainy IBC Chapter 17: <br /> Site Condition wet Site Equipment: <br /> ❑ Structural Masonry ❑ Soils <br /> E Structural Steel/Welding ❑ Reinforced Concrete <br /> ❑ Foundation/Shoring ❑ Shotcrete <br /> ❑ TESC/BMP ❑ Post-Tensioned Concrete <br /> ❑ Auger Cast Pile ❑ Light Gauge Steel <br /> ❑ Lateral Wood Framing ❑ Batch plant <br /> Location and Description of Inspection <br /> Arrived at the site and met with Site Supervisor,Justin. <br /> Reviewed drawings S3.TN <br /> Began inspection <br /> North Trash Enclosure: <br /> (12)HSS4x4 posts to roof beams'/4"fillet welds-All Acceptable <br /> (12)HSS4x4 posts to bottom plates'/4"fillet welds-All Acceptable <br /> F a <br /> Items requiring correction <br /> n/a <br /> HMA Inspector Print Name Brad Becker <br /> HMA Representative Signature <br /> Page 1 of 1 <br />