Laserfiche WebLink
GD-1 <br />NOTE: <br />M <br />--------------- ------J- <br />--_-------------------------------F <br />-- <br />I <br />I; I <br />,I <br />� I <br />I� <br />II I <br />I <br />i <br />I S'v I <br />I <br />S <br />4 SLAB -ON -GRADE <br />`- J <br />/ #4 AT 24° O.C. EA WA <br />OVER 4" CLEAN GRAVEL <br />I <br />I I <br />I I <br />I <br />I <br />-------- <br />I I <br />I I <br />I I <br />I I <br />I I <br />I <br />gPPIP� <br />I <br />I b}o�05�- I <br />I <br />----------------------- <br />------------------------------------4 <br />1. ALL POST AND PLATES TO BE PAINTED OR COATED PER ARCH SPECIFICATION. <br />Q <br />(DRIP AT <br />S15 STL CONN. <br />C72x2D 7 <br />8' CMU WALL <br />i <br />I <br />I <br />I <br />I <br />J CONTROLLING HS <br />8'-3" HEIGHT <br />25% OF SEISMIC L <br />18 iYP <br />I S15 <br />i <br />TRASH ENCLOSURE FOUNDATION PLAN <br />S15 SCALE 1/4" = 1'-0° <br />EXTERIOR BEAM <br />S POST <br />DAD <br />N N N <br />U II U <br />N N <br />U U <br />I <br />I <br />O N <br />U; <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />11 <br />I <br />II <br />I <br />I <br />C12x20. / <br />"�-22 GA METAL <br />ROOF DECKING <br />8 TRASH ENCLOSURE ROOF PLAN <br />S15 SCALE 1/4" = I'-C' <br />TRASH ENCLOSURE KEY PLAN <br />HALF SCALE <br />DCG <br />