Laserfiche WebLink
VERETT <br />0 <br />Permit Number: M2401-018 <br />Applied: 1/5/2024 <br />Issued: 5/22/2024 <br />Status: FINALED <br />Parent Permit: B2309-071 <br />Parent Project: <br />Permit Inspections <br />City of Everett <br />Approved:5/21/2024 <br />Fi n a I ed : 8/12/2024 <br />Description: Mechanical - Kitchen -INCLUDES TYPE I HOOD <br />Site Address: 8417 EVERGREEN WAY STE 3 <br />City, State Zip Code: EVERETT, WA 98208-2613 <br />Applicant: Nos Narin <br />Owner: CFT NV DEVELOPMENTS LLC <br />Contractor: LEE'S HOME REMODEL <br />Details: <br />6/6/24 REVISIONS AFTER ISSUANCE APPROVED: ADD 4" EXHAUST VENT PIPE IN EACH BATHROOM (2 TOTAL), ADD (6) 8" FLEX <br />INSULATION DUCT LINE, ADD (1) 10" RETURN AIR AT HALLWAY. (SENT TO MECHANICAL REVIEWERS) <br />Permit for Class I hood and make-up air for commericial, tenant improvement <br />6/13/24 SCOPE UPDATE: ADD (1) GAS PIPING OUTLET - EXISTING WAS RELOCATED <br />SCHEDULED DATE <br />COMPLETED DATE <br />TYPE <br />INSPECTOR <br />RESULT <br />REMARKS <br />6/7/2024 <br />6/7/2024 <br />MECH 04-ROUGH <br />JASON <br />APPROVAL <br />see notes <br />IN <br />MORRISSEY <br />Notes: <br />6/6/2024 3:47 PM Keith Ta <br />Light test on exhaust duct before fire wrap and installation. Can you accommodate an insepction between 10-11 please? Thank you! <br />Contact Name: Keith Ta <br />Site Address: 8417 EVERGREEN WAY STE 3 <br />Phone:2066831414 <br />e-Mail: kta@greatsuncorp.com <br />- Light test on exhaust duct before fire wrap and installation.*** Fire wrap to be verified at final.*** Hood to be listed zero clearance. (Verify at final) <br />6/7/2024 <br />6/7/2024 <br />MECH 04-ROUGH <br />JASON <br />APPROVAL <br />see notes <br />IN <br />MORRISSEY <br />Notes: <br />- Rough HVAC ducting ok. <br />7/19/2024 <br />7/19/2024 <br />GAS 01-ROUGH IN <br />JASON <br />APPROVAL <br />see notes <br />MORRISSEY <br />Notes: <br />Site Address: 8417 EVERGREEN WAY STE 3 <br />Phone:2066831414 <br />e-Mail: kta@greatsuncorp.com <br />jjm changed Inspection Type from GAS 03-FINAL to GAS 01-ROUGH IN <br />- Rough gas piping to fryer units. <br />7/19/2024 <br />7/19/2024 <br />MECH 04-ROUGH <br />JASON <br />APPROVAL <br />IN <br />MORRISSEY <br />Notes: <br />- Already approved on prior inspection, 6/7/24. <br />Printed: Tuesday, 29 April, 2025 1 of 2 rz <br />SUPERION <br />