My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8417 EVERGREEN WAY MOCHINUT 2025-08-06
>
Address Records
>
EVERGREEN WAY
>
8417
>
MOCHINUT
>
8417 EVERGREEN WAY MOCHINUT 2025-08-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2025 9:27:11 AM
Creation date
4/29/2025 11:40:41 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
8417
Tenant Name
MOCHINUT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Connect sprinkler heads to sub -mains at least four times faster. <br />FlexHead systems connect sprinkler heads to sprinkler sub -mains in about a quarter of the time it takes to install <br />hard pipe. Expect even greater savings in retrofits, where FlexHead insta I Is six to seven times faster than hard pipe. <br />Increase productivity with the ease of installation, no need to install hangers and there is noon -site assembly <br />required. Every sprinkler connection is a finished, pre -constructed assembly, from the 1" pipe connector to the <br />sprinkler head outlet. In addition, FlexHead provides seismic protection to sprinkler heads allowing ford eflection <br />during a seismic event. <br />NEW CONSTRUCTION COMPARISON <br />During atypical installation, a minimum of four <br />FlexHeads can be installed in the same time ittakes <br />to do one hard -pipe. <br />Four Flexhead <br />(5 0 6 <br />One Hard -Pipe e F <br />WANT PINPOINT LOCATIONS? NO PROBLEM. <br />The design makes it easy to accurately locate sprinkler heads <br />every time. If the spec calls for center -of -tile placement, you <br />can do itwith ease. In fact, you get center -of -tile placement <br />every install whetherthe spec calls for it or not. Ittakes one <br />more headache out of specifying and bidding. <br />ACCOMMODATE FLOOR PLAN CHANGES. <br />Need to relocate sprinkler heads? No problem. With its <br />built-in flexibility it's much easierto move heads to a new <br />location to accommodate new layouts or uses of the space. <br />RETROFIT COMPARISON <br />During a typical installation, a minimum of six FlexHeads <br />can be installed in the same time it takes to do one <br />hard -pipe. Retrofits in less time. <br />Six Flexhead <br />(5 6 6 <br />One Hard -Pipe e T <br />RETROFITS IN LESS TIME. <br />Need to comply to code in unsprinklered buildings? <br />In contrast to costly and labor-intensive hard -pipe retrofits, <br />FlexHead connections install in minutes in even the most <br />restrictive spaces. <br />SHORTEN YOUR TIME TO OCCUPANCY. <br />Faster installation times help get end -users into their spaces <br />more quickly —and get installers on their next projects faster. <br />FlexHead connections virtually eliminate punch list items <br />commonly found with hard -pipe armovers. <br />
The URL can be used to link to this page
Your browser does not support the video tag.