My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016/04/06 Council Agenda Packet
>
Council Agenda Packets
>
2016
>
2016/04/06 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 11:46:50 AM
Creation date
4/12/2016 11:45:50 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/6/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VALLEY BID PROTEST COUNCIL PRESIDENT SCRIPT <br /> April 6,2016/Item 10 <br /> Introduction <br /> The next item is a bid award regarding the 41st Street to West Marine View Drive Corridor <br /> Improvements Project. The apparent low bidder is Valley Electric. However, the recommended bid <br /> award is to Marshbank Construction as the lowest responsive and responsible bidder. <br /> A bid protest regarding an award to Marshbank has been filed by Valley Electric. <br /> 90)Ofr (CPresentation <br /> @ Is there a representative of Valley Electric present tonight? <br /> av <br /> If valley-Represe c*Presen If Valley Representativ NOT Present <br /> • Ask Ryan Sass to give short introduction • Ask Ryan Sass to give brief summary of <br /> project, protest, and staff <br /> • Then ask Valley representative to state recommendation <br /> their protest briefly. <br /> • Then Ryan Sass to explain staff <br /> recommendation regarding protest and <br /> bid award <br /> Council Decision CAA <br /> After presentation and questions,the Council decides. <br /> Council Decision Options: l/t <br /> 1 (Staff Recommendation): Reject Protest, Reject Valley bid, and Award to Marshbank: <br /> Amended Action Item/Motion: <br /> Reject the Protest from Valley Electric, Reject the Bid from Valley Electric as Non-Responsive, <br /> and Award the contract bid for the 41st Street to West Marine View Drive Corridor <br /> Improvements Project to Marshbank Construction of Lake Stevens,Washington, in the amount <br /> of$2,758,753, including Washington State sales tax. <br /> 2. Holdover for later Council Meeting. <br /> This is because any action other than award to Marshbank does not have WSDOT concurrence. <br /> Since the project is federally funded,that concurrence is required. If Council wants to do <br /> something other than award to Marshbank(such as reject all bids or award to Valley), staff will <br /> need time to study if that is possible and report back to council. <br />
The URL can be used to link to this page
Your browser does not support the video tag.