Laserfiche WebLink
Tabet Li 01' 6 <br /> Item Ref Plan;' Unit Item Description:' ' ' Unit Cost' Total Amount <br /> No. Specs. Qty <br /> 22 8-14 870 SY CEMENT CONC.SIDEWALK <br /> $ • <br /> $ <br /> 23 8-04 1,920 LF CEMENT CONC.TRAFFIC <br /> CURB AND GUTTER <br /> $ $ <br /> II <br /> 24 8-04,5 250 CEMENT CONC.PEDESTRIAN <br /> CURB <br /> $ <br /> 25 8-14 2 EACH TYPE B CURB RAMP <br /> (specs) <br /> $ $ <br /> 26 8-14 2 EACH TYPE D CURB RAMP WITH 4' <br /> (specs) LANDING <br /> 27 8-14 7 EACH TYPE 0 CURB RAMP WITH 8' <br /> (specs) LANDING <br /> $ • $ • <br /> 28 8-14 1 EACH TYPE PERPENDICULAR B <br /> (specs) RAMP <br /> $ • $ <br /> 29 8-06 130 SY CEMENT CONCRETE <br /> DRIVEWAY RAMP TYPE 1 <br /> $ —^ $ <br /> 30 1-07.15 1 LS SPCC PLAN <br /> $ $ • <br /> 31 8-01.5 30 DAY ESC LEAD <br /> $ $ <br /> 32 8-01 5,000 FA EROSION/WATER <br /> POLLUTION CONTROL $ 1 .00 $ 5, <br /> +oO <br /> 33 8-01.5 2,850 SEEDING, FERTILIZING,AND <br /> MULCHING — ' cg50 --- <br /> $ $ <br /> 34 8-02.3(4) 60 TOPSOIL TYPE C <br /> • <br /> 41"STREET TO WMVD FREIGHT �\ <br /> CORRIDOR IMPROVEMENTS <br /> FED AID#STPUL-9931(O12); PW#3472 4 February 17,2016 { <br /> 'rovided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scale 5.) <br />