My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016/04/06 Council Agenda Packet
>
Council Agenda Packets
>
2016
>
2016/04/06 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 11:46:50 AM
Creation date
4/12/2016 11:45:50 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/6/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Agency Name <br /> City of Everett Local Agency Subcontractor List <br /> Prepared in compliance with RCW 39.30.060 as amended <br /> Local Agency Address <br /> 2930 Wetmore <br /> Everett WA 98201 To Be Submitted with the Bid Proposal <br /> Project Name 41st Street to West Marine View Drive Freight Corridor Improvements <br /> Failure to list subcontractors with'whom the bidder,if awarded the contract,will directly subcontract for <br /> performance of the work of heating,ventilation and air conditioning,plumbing,as described Chapter 18.106 <br /> RCW,and electrical,as described in Chapter 19.28 RCW or naming,`more than one subcontractor to perform <br /> the same work will result in your bid being non-responsive and therefore void: <br /> Subcontractors)with whom the bidderwill directly subcontract that are proposed to perform the work of heating, <br /> ventilation and-airconditioning,plumbing,as described in Chapter:18.106 RCW, and electrical as described in Chapter <br /> 19.28 RCW must be listed below. The work to be performed is to be listed below the subcontractor(s)name: <br /> To tate extefttl a?rotect irtcli des one<oir snore.categories ofwork referenced in RCW239:3O,O6Okancl;:no_ <br /> subcontractor is bide b Clow to terfortnlucfi.wo rk,the biidde>r-certifies at the'Worlt:wiil eitherfi)be <br /> performed by;the::brd ter itself*nr;itii be performed br a Iovliei tfer>_` theoidfreotor Wha w[lcnotbontiracttlirebtly_ <br /> with thebidder:`' <br /> Subcontractor Name VALLEY ELECTRIC CO.OF MOUNT VFRNON INC.-FI FCTRICAL-SF!F PFRFf1RM , <br /> Work to be Performed <br /> Subcontractor Name ,. --,:_..... <br /> Work to be Performed <br /> Subcontractor Name <br /> Work to be Performed. <br /> Subcontractor Name <br /> Work to be Performed <br /> Subcontractor Name <br /> Work to be Performed <br /> Subcontractor Name <br /> Work to be Performed <br /> Bidder's are notified that is the opinion of the enforcement agency that PVC or metal conduit,junction boxes, etc, are <br /> considered electrical equipment and therefore considered part of electrical work, even if the installation is for future use <br /> and no wiring or electrical current is connected during the project. <br /> SR <br /> DOT Form 271-015A EF <br /> Revised 08/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.