My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016/04/06 Council Agenda Packet
>
Council Agenda Packets
>
2016
>
2016/04/06 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 11:46:50 AM
Creation date
4/12/2016 11:45:50 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/6/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• , <br /> A&A <br /> APWA-1/VA[Division 1 Committee rev. 1/8/203.6' <br /> Proposal for Incorporating Recycled Materials into the Project <br /> In compliance with a new law that went into effect January 1, 2016 (SHB1695), the Bidder shall <br /> propose below, the total percent of construction aggregate and concrete materials to be <br /> incorporated into the Project that are recycled materials. Calculated percentages must be within <br /> the amounts allowed in Section 9-03.21(1)E, Table on Maximum Allowable Percent (By Weight) <br /> of Recycled Material' of the Standard Specifications. <br /> Proposed total percentage: percent, <br /> Note: Use of recycled materials is highly encouraged within the limits shown above, bUt does <br /> not constitute a Bidder Preference, and will not affect the determination of award, unless two or <br /> more lowest responsive Bid totals are exactly equal;in which case proposed recycling <br /> percentages will be used as a tie-breaker, per the APWA GSPiln Section 1-03.1 of the Special <br /> Provisions. Regardless, the Bidder's stated proposed percentages will become a goal the <br /> Contractor should dolts best to accomplish. Bidders will be required to report on recycled <br /> materials actually incorporated into the Project, in accordance with the AF'WA,GSP in Section. <br /> 1-06.6 of the Special Provisions. <br /> Bidder: Valley Electric co.of Mount Vernon,Inc _ <br /> Signature of Authorized Official: _ (Robert Carrithers,CFO) <br /> Date: 3/15/2016 <br /> . - • <br />
The URL can be used to link to this page
Your browser does not support the video tag.