My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 6814 with exhibits
>
Resolutions
>
Resolution 6814 with exhibits
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2016 11:45:16 AM
Creation date
6/13/2016 11:43:42 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
Resolution 6814 with exhibits
Date
1/21/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. : 1 Iii= : C <br /> alley <br /> i Emil itull pnd. Inn <br /> -------- II <br /> lnranrc, <br /> IL <br /> • . Pedestrian connections through the parking lot. <br /> pedestrian & bike paths <br /> 6. PEDESTRIAN WAYS AND BIKE PATHS <br /> INTENT: <br /> To provide safe and enjoyable public access through use of a continuous pedestrian <br /> way or path around and through the project site. <br /> GUIDELINES: <br /> 6.a. Improvements along West Marine View Drive on the west side shall include <br /> a sidewalk, bikeway and landscaping, together with street lighting and signage <br /> described in these Guidelines. See Sections 1 and 3. <br /> 6.b. The continuous walkway along the water's edge will include enough room <br /> (15' minimum unobstructed) to accommodate pedestrians except as provided for in <br /> Exhibit 16. Landscaped plazas and public access corridors will be provided along each <br /> of the water edges, as shown on the pedestrian and bikeway connection plans. <br /> 6.c. The pedestrian corridors will be a continuous pedestrian feature connecting <br /> the south, central and north marinas to Jetty Landing at 10th Street and West Marine <br /> View Drive with the water's edge. <br /> There will be at a minimum three north-south pedestrian corridors: one along the west <br /> side of West Marine View Drive, one from the Central Marina to the North Marina and <br /> the 10th Street boat launch, and one along the western Esplanade. There will be four <br /> east-west connections: one along the south edge of the development, one at 14th <br /> Street, one on the interior of the site between the southern and northern shoreline and <br /> one along the south edge of the 12th Street Marina from the west-end Esplanade going <br /> east and connecting to the north-south walkway along the east side of the 12th Street <br /> Marina. These connections are represented on the following diagram. <br /> Waterfront Place Central Design Standards & Guidelines 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.