Laserfiche WebLink
Section C: Master Plan <br /> Phasing <br /> A preferred site master plan has been developed for the Waterfront Place Central. Developed <br /> from previous site design alternatives for the "North Marina" project as it was previously called, <br /> it reflects community input and the needs of the Port of Everett and the community it serves. It <br /> preserves the established use options and circulation system, while maintaining flexibility in <br /> phasing. The master plan of the site includes a collection of Districts that define unique areas and <br /> uses throughout the site. Location of district borders could shift, but the general layout will not <br /> substantially change. <br /> Land Use <br /> Waterfront Place Central will have a Waterfront Commercial Comprehensive Plan designation. <br /> Rezoning of the site from Maritime Services (M-S) to Waterfront Commercial (W-C) was <br /> implemented through a Planned Development Overlay zone (PDO). Future uses will include not <br /> only the existing maritime businesses and operations, but also a wide range of public amenity, <br /> commercial, and residential land use. <br /> Phasing <br /> Phasing began with shifting most of the existing maritime uses to the Craftsman District. Some <br /> of these uses are accommodated in new facilities. Improvements such as north Basin and 13th <br /> Street has laid the foundation for the Phase I development. Phase 1 is the Fisherman's Harbor <br /> District and also include portions of the Esplanade. Subsequent Phases move toward the west <br /> end of the site, to the Millwright District and then Fisherman's Harbor. More details on phases <br /> and their accompanying infrastructure investments are found in the PDO. <br /> 2014 Waterfront Place Central Supplemental Design Guidelines - 17- <br />