My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 6/8/2016
>
Contracts
>
Capital Contract
>
Granite Construction 6/8/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2016 11:52:43 AM
Creation date
6/13/2016 11:52:33 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
6/8/2016
Council Approval Date
6/1/2016
Department
Public Works
Department Project Manager
Tom Fuchs
Subject / Project Title
Job Complete 2015 HMA Overlay
Tracking Number
0000137
Total Compensation
$4,970,297.57
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CERTIFICATE OF COMPLETION <br /> Project: 2015 Hot Mix Asphalt Overlay <br /> Contractor: Granite Construction <br /> Work Order No. PW3596 <br /> The above mentioned project was constructed per the plans and specifications and to the <br /> satisfaction of the Public Works Department. <br /> The Contractor physically completed the project, within the time allowed in the contract. <br /> It is recommended that the City accept this project as complete. <br /> Recommended by: <br /> 0-1W16c ,tu,, 1 tar v.e_ 17 5 7 LL <br /> Public Works Director D to <br /> Dave Davis <br /> Approved by: <br /> r 4.01" , _OY )14 <br /> ayor,[y ty of E ,"-rett ate <br /> Ray St; " anson <br /> Atte• : / '/ <br /> y C erk <br /> Sharon Fuller <br /> APPROVED AS TO FORM <br /> By: 9//22 <br /> im Iles, City Attorney <br /> C/G/lc— <br /> Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.