My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Washington State Dept. of Ecology 3/27/2025
>
Contracts
>
Agreement
>
Other Agreements
>
Washington State Dept. of Ecology 3/27/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2025 2:07:05 PM
Creation date
5/1/2025 1:56:32 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Washington State Dept. of Ecology
Approval Date
3/27/2025
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
Biosolids General Permit Application Renewal
Tracking Number
0004808
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Other Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />Page 1 of 8 <br />Marshland Site Sampling and Analysis Plan (SAP) <br />WPCF Operations <br />Marshland Soil Nutrients Sampling and Groundwater Monitoring <br />Revised 2/21/25 <br />A. Overview <br />Biosolids dredged from the WPCF may be land applied to the City of Everett Marshland Site on Lowell- <br />Snohomish River Road. The East and West fields of the Marshland Site are separated by the Marshland <br />Canal (Appendix A). The City collects soil samples from the fields to determine nutrient levels and <br />agronomic application rates for each field prior to biosolids application and to monitor plant nutrient <br />uptake after crop cutting. Samples are collected below the organic layer and composited for analysis. <br />Groundwater monitoring is also conducted for this site prior to biosolids application. Minor modifications <br />to the implementation of the SAP will be made to ensure representative samples are collected. <br />B. Access Requirements <br />Gates are locked with chain to prevent public access. The code for the combination lock is . <br />Do not drive on fields if too muddy (tire ruts make cause complications for farming equipment) or if the <br />field has been planted. Make sure vehicle has 4WD. <br />C. Hazards & Safety Precautions <br />Personal protective equipment (PPE) is required when handling biosolids sampling equipment, including <br />steel-toed boots and gloves. Rainboots may be required after rain events. Due to wet conditions on the <br />fields, only drive and park vehicles in the areas indicated on the map in Appendix A. <br />D. Analytes <br />1) pH (soil) <br />2) Total Kjeldahl Nitrogen (TKN) <br />3) Ammonia <br />4) Nitrate <br />5) Nitrite <br />E. Equipment and Supplies <br />1) Shovel, post-hole digger or core sampler <br />2) Cordless drill/driver with bucket mixer attachment. <br />3) Socket wrench kit for opening monitoring well covers. <br />4) Two 5-gallon buckets. <br />5) Map of East and West Fields with sample location markers (Appendix A). <br />6) 6 sample jars per field (250 mL clear glass wide-mouth jars with Teflon-lined lid). <br />7) Sample container labels. <br />8) Chain of custody form (COC) and pen. <br />
The URL can be used to link to this page
Your browser does not support the video tag.