|
2 3 1 4 5
<br /> GENERAL NOTES NON-STRUCTURAL ELECTRICAL NOTES ABBREVIATIONS
<br /> A AMPERE MAX MAXIMUM
<br /> 1. PERFORM WORK IN ACCORDANCE WITH APPLICABLE 15. PRIOR TO STARTING TELECOMMUNICATIONS 1. THE FOLLOWING ITEMS ARE TAKEN DIRECTLY FROM AC AIR CONDITIONING;ALTERNATING CURRENT; MC MAIN CROSS CONNECT;METAL CLAD(CABLE)
<br /> NATIONAL AND STATE CODES AS AMENDED LOCALLY INSTALLATION,CAREFULLY INSPECT INSTALLED THE 2015 INTERNATIONAL BUILDING CODE AND FROM ABOVE COUNTER MCB MAIN CIRCUIT BREAKER
<br /> AND ENFORCED BY THE AHJ. WORK OF OTHER TRADES AND VERIFY THAT SUCH THE AMERICAN SOCIETY OF CIVIL ENGINEERS(ASCE) AF AMP FUSE;AMP FRAME MCC MOTOR CONTROL CENTER
<br /> WORK IS COMPLETE TO THE POINT WHERE WORK STANDARD 7.THE CONTRACTOR SHALL REFER TO THE AFF ABOVE FINISHED FLOOR MDF MAIN DISTRIBUTION FRAME DYKEMAN
<br /> 2. OBTAIN AND PAY FOR PERMITS REQUIRED FOR MAY PROPERLY COMMENCE. NOTIFY THE ARCHITECT ABOVE FOR ADDITIONAL INFORMATION,EXCEPTIONS, AG ABOVE GRADE MDP MAIN DISTRIBUTION PANEL
<br /> INSTALLATION OF WORK.ARRANGE AND SCHEDULE AND ENGINEER IN WRITING OF CONDITIONS AND FURTHER DESCRIPTIONS.THE CONTRACTOR AHJ AUTHORITIES HAVING JURISDICTION MFR MANUFACTURER
<br /> REQUIRED INSPECTIONS. DETRIMENTAL TO THE PROPER AND TIMELY SHALL ADHERE TO REQUIREMENTS AND AS SUCH, AHU AIR HANDLING UNIT MH MANHOLE
<br /> COMPLETION OF THE WORK. SHALL BE INCLUDED WITHIN BID.ALSO REFER TO AIC AMPERE INTERRUPTING CURRENT MIN MINIMUM DESIGNARCHITECTURE +
<br /> 3. COORDINATE WITH UTILITY COMPANIES FURNISHING SPECIFICATIONS. AL ALUMINUM MLO MAIN LUGS ONLY
<br /> SERVICES TO PROJECT. INSTALLATION OF UTILITY 16. DO NOT BEGIN TELECOMMUNICATIONS INSTALLATION ANSI AMERICAN NATIONAL STANDARDS INSTITUTE MM MULTIMODE
<br /> D SERVICES SHALL BE IN ACCORDANCE WITH UTILITY UNTIL ALL UNSATISFACTORY CONDITIONS ARE 2. 2015 IBC,1613.1,SCOPE:ARCHITECTURAL, AS AMP SWITCH MPOE MAIN POINT OF ENTRY - D
<br /> REQUIREMENTS.VERIFY APPLICABLE INSTALLATION RESOLVED. BEGINNING WORK CONSTITUTES MECHANICAL,ELECTRICAL,AND NON-STRUCTURAL AT AMP TRIP MPOP MAIN POINT OF PRESENCE
<br /> STANDARDS AND REQUIREMENTS. PROVIDE AND ACCEPTANCE OF CONDITIONS AS SATISFACTORY. COMPONENTS THAT ARE PERMANENTLY ATTACHED TO ATM ASYNCHRONOUS TRANSFER MODE MTD MOUNTED
<br /> SUBMIT ELECTRICAL DRAWINGS TO UTILITY FOR STRUCTURES AND THEIR SUPPORTS AND ATS AUTOMATIC TRANSFER SWITCH MTS MANUAL TRANSFER SWITCH
<br /> APPROVAL PRIOR TO ROUGH-IN AND PRIOR TO 17. ROUTE CATEGORY 6/6A CABLES TO THEIR ASSIGNED ATTACHMENTS SHALL BE DESIGNED AND AV AUDIO VISUAL
<br /> ORDERING EQUIPMENT. CROSS-CONNECT PER THE IDENTIFICATION LABEL AT CONSTRUCTED TO RESIST THE EFFECTS OF AWG AMERICAN WIRE GAUGE (N) NEW
<br /> EACH TELECOMMUNICATIONS WORKSTATION DEVICE. EARTHQUAKE MOTIONS IN ACCORDANCE WITH ASCE 7, N NEUTRAL
<br /> 4. COORDINATE ELECTRICAL WORK WITH THAT OF TERMINATE ALL CABLES ON 48-PORT PATCH PANELS EXCLUDING CHAPTER 14 AND APPENDIX 11A. BAS BUILDING AUTOMATION SYSTEM NAC NOTIFICATION APPLIANCE CIRCUIT
<br /> OTHER TRADES.REFER TO MECHANICAL,CIVIL,AND ON RACKS UNLESS OTHERWISE NOTED. BATT BATTERIES NEC NATIONAL ELECTRICAL CODE H A R G I S
<br /> LANDSCAPE DRAWINGS AND SPECIFICATIONS. 3. ASCE 7-02,11A.1.2.2,CONTRACTOR RESPONSIBILITY: BIL BASIC IMPULSE INSULATION LEVEL NATIONAL ELECTRICAL MANUFACTURERS
<br /> COORDINATION SHALL OCCUR PRIOR TO 18. THE ELECTRICAL CONTRACTOR SHALL PROVIDE ALL EACH CONTRACTOR SHALL BE RESPONSIBLE FOR THE gKBD BACKBOARD NEMA ASSOCIATION
<br /> FABRICATION,PURCHASE,AND INSTALLATION OF CONDUIT,OUTLET BOXES,JUNCTION BOXES, CONSTRUCTION OF A SEISMIC-FORCE-RESISTING BKR BREAKER NF NON-FUSED =01[bird av '.UltefiW,seatble,wx 99101
<br /> WORK. RACEWAY SYSTEMS,ETC.FOR A COMPLETE AND SYSTEM,DESIGNATED SEISMIC SYSTEM,OR BLDG BUILDING NIC NOT IN CONTRACT -all 206,OCa.dKe heryb.bh
<br /> OPERATIONAL PATHWAY SYSTEM FOR ALL COMPONENT LISTED IN THE QUALITY ASSURANCE PLAN NIL NIGHT LIGHT
<br /> 5. COMPLETION OF WORK SHALL BE EXECUTED IN TELECOMMUNICATIONS SYSTEMS PER THE SCOPE OF SHALL SUBMIT A WRITTEN CONTRACTOR'S STATEMENT C CONDUIT;DEGREES CELSIUS
<br /> ACCORDANCE WITH THE PROJECT SCHEDULE. WORK INDICATED ON THE CONSTRUCTION DRAWINGS OF RESPONSIBILITY TO THE REGULATORY AUTHORITY
<br /> SCHEDULE INSTALLATION WITH OTHER TRADES TO AND BID SPECIFICATIONS. HAVING JURISDICTION AND TO THE OWNER PRIOR TO CAB CABINET OFC OPTICAL FIBER CABLE
<br /> ENSURE PROJECT MILESTONES ARE MET. THE COMMENCEMENT OF WORK ON THE SYSTEM OR CAT CATEGORY OHL OVERHEAD LINE •
<br /> 19. CABLE TRAY PATHWAYS ABOVE ACCESSIBLE COMPONENT.THE CONTRACTOR'S STATEMENT OF CAN COMMUNITY ANTENNA TELEVISION OL OVERLOAD --
<br /> 6. DRAWINGS ARE DIAGRAMMATIC AND DO NOT SHOW CEILINGS SHALL BE PROVIDED BY THE ELECTRICAL RESPONSIBILITY SHALL INCLUDE THE FOLLOWING: CB CIRCUIT BREAKER OS OCCUPANCY SENSOR g
<br /> ALL COMPONENTS REQUIRED FOR A COMPLETE CONTRACTOR.CABLE TRAY PATHWAYS BELOW CCTV CLOSED CIRCUIT TELEVISION OSP OUTSIDE PLANT
<br /> INSTALLATION.PROVIDE COMPONENTS REQUIRED RAISED FLOOR SPACES SHALL BE PROVIDED BY THE A. ACKNOWLEDGMENT OF AWARENESS OF THE CLG CEILING
<br /> FOR COMPLETE AND OPERATIONAL SYSTEMS TELECOMMUNICATIONS CONTRACTOR. SPECIAL REQUIREMENTS CONTAINED IN THE CM CEILING-MOUNTED P POLE
<br /> INCLUDING RACEWAYS,CONDUCTORS,BOXES, QUALITY ASSURANCE PLAN; CO CONDUIT ONLY PBX PRIVATE BRANCH EXCHANGE
<br /> SUPPORTS AND SIMILAR ITEMS. B. ACKNOWLEDGMENT THAT CONTROL WILL BE COW COMPUTER ON WHEELS PF POWER FACTOR
<br /> EXERCISED TO OBTAIN CONFORMANCE WITH CR CONTROLLED RECEPTACLE PH PHASE
<br /> 7. BRANCH CIRCUIT HOMERUNS ARE SHOWN TO THE CONSTRUCTION DOCUMENTS APPROVED CT CURRENTTRANSFORMER PIR PASSIVE INFRARED "�
<br /> INDICATE CIRCUIT PROPERTIES AND CONFIGURATION. BY THE AUTHORITY HAVING JURISDICTION; CU COPPER PIV POST INDICATING VALVE �11\I1q
<br /> SINGLE-CIRCUIT HOMERUNS SERVED FROM THE C. PROCEDURES FOR EXERCISING CONTROL PNL PANEL
<br /> C SAME PANELBOARD MAY BE COMBINED IN WITHIN THE CONTRACTOR'S ORGANIZATION,THE DDC DIRECT DIGITAL CONTROL PP PATCH PANEL PROJECT C
<br /> ACCORDANCE WITH THE DIVISION 26 SPECIFICATIONS, METHOD AND FREQUENCY OF REPORTING AND DEMARC DEMARCATION POINT PT POTENTIAL TRANSFORMER
<br /> UNLESS INDICATED OTHERWISE. EXTEND AND THE DISTRIBUTION OF THE REPORTS;AND DISC DISCONNECT PVC POLYVINYL CHLORIDE
<br /> CONNECT BRANCH CIRCUIT RACEWAY AND WIRING D. IDENTIFICATION AND QUALIFICATIONS OF THE DIST DISTRIBUTION Jackson E S
<br /> FROM HOMERUN TO DEVICES AND EQUIPMENT WITH PERSON(S)EXERCISING SUCH CONTROL AND DSL DIGITAL SUBSCRIBER LINE RCP REFLECTED CEILING PLAN
<br /> CIRCUIT NUMBERS INDICATED. CONDUCTOR THEIR POSITION(S)IN THE ORGANIZATION.QUANTITIES AND SIZES ARE INDICATED AT DWG DRAWING REP RECEPTACLE Portable 6
<br /> REF REFER TO
<br /> HOMERUNS ONLY.SHOW ACTUAL RACEWAY 4. DIVISION 26 RESPONSIBILITIES: (E) EXISTING REV REVISION
<br /> ROUTING AND CIRCUITING ON RECORD DRAWINGS. EA EACH RM ROOM FOR
<br /> MINIMUM CONDUCTOR SIZE#12 AWG. A. HANGERS AND SEISMIC BRACING FOR
<br /> ELECTRICAL SYSTEMS SHALL BE DESIGNED AND EF EXHAUST FAN RU RACK UNIT
<br /> 8 LOCATIONS F RACEWAY,PATHWAY AND SIMILA SPECIFIED BY DVISION 26. DIVISION 26 SHAEMS ARE SO OWN SCHEMATICALLY.COORDINATE REFER TOT E EI LECTRICAL DRAWINGS FORLL E EV ELEVATIONEIA IC INDUSTRIES ASSOCIATION SHT SHEET Everett Public
<br /> INSTALLATION,INCLUDING BUT NOT LIMITED TO LOCATIONS OF EQUIPMENT AND ELECTRICAL EM EMERGENCY SLC SIGNALING LINE CIRCUIT Schools
<br /> OOIS
<br /> CABLING,TELECOMMUNICATION PATHWAYS AND SYSTEMS AS STRUCTURAL DRAWINGS DO NOT EMT ELECTRICAL METALLIC TUBING SM SINGLEMODE J
<br /> SPACES,AND EXACT LOCATION OF HORIZONTAL AND SHOW THE LOCATIONS OF ELECTRICAL ENCL ENCLOSURE SMFC SURFACE-MOUNTED OPTICAL FIBER CABINET
<br /> BACKBONE CABLING WITH LOCATIONS OF FIXED EQUIPMENT,RACEWAYS,AND OTHER EPM ELECTRONIC POWER METER SMR SURFACE METAL RACEWAY AT
<br /> CASEWORK AND BUILDING CONDITIONS AFFECTING COMPONENTS. EPO EMERGENCY POWER OFF SONET SYNCHRONOUS OPTICAL NETWORK
<br /> THE WORK OF THIS CONTRACT. B. DIVISION 26 SHALL COORDINATE THE SUPPORT EQUIP EQUIPMENT SP SERVICE PROVIDER
<br /> 9. COORDINATE TELECOMMUNICATIONS WORK WITH SYSTEMS AND DESIGN LOADS FOR HUNG ETR EXISTING TO REMAIN SPD SURGE PROTECTIVE DEVICE 3700 Federal Ave
<br /> THAT OF OTHER TRADES. REFER TO ELECTRICAL, RACEWAYS AND OTHER ELECTRICAL SYSTEMS EWC ELECTRIC WATER COOLER SPEC SPECIFICATIONS
<br /> MECHANICAL,ARCHITECTURAL,STRUCTURAL,CIVIL, (INCLUDING COMBINED MULTIPLE RACEWAY SPST SINGLE POLE SINGLE THROW Everett WA 98201
<br /> AND LANDSCAPE DRAWINGS AND SPECIFICATIONS. RUNS)WITH THE GENERAL CONTRACTOR AND F FUSE;DEGREES FAHRENHEIT ST SHUNT TRIP
<br /> COORDINATION SHALL OCCUR PRIOR TO THE STEEL AND WOOD JOIST MANUFACTURERS FA FIRE ALARM STP SHIELDED TWISTED PAIR ELECTRICAL PERMIT SET
<br /> FABRICATION,PURCHASE,AND INSTALLATION OF IN ADDITION TO OTHER TRADES THAT MAY BE FAAP FIRE ALARM ANNUNCIATOR PANEL SVGA SUPER VIDEO GRAPHICS ARRAY
<br /> WORK. IMPACTED. FACP FIRE ALARM CONTROL PANEL SW SWITCH 02/21/2024
<br /> 10. NEW CABLING INSTALLATIONS SHALL BE CONCEALED FBO FURNISHED BY OWNER SWBD SWITCHBOARD
<br /> FURNISHED BY OWNER INSTALLED BY This drawing is:
<br /> IN WALL,CEILINGS,AND BELOW RAISED FLOOR FOIC CONTRACTOR TBB TELECOMMUNICATIONS BONDING BACKBONE 1.Copyright 2023 Dykeman,Inc.
<br /> SPACES UNLESS OTHERWISE NOTED ON THE FOIO FURNISHED BY OWNER INSTALLED BY OWNER TEL TELEPHONE 2.The Architect's Instrument of Professional Service.
<br /> B DRAWINGS.CABLING INACCESSIBLE CEILING 3.For use on this project only.Obtain Architect's B
<br /> FSD FIRE SMOKE DAMPER TELCO TELEPHONE COMPANY written permission for an other use or reproduction.
<br /> SPACES SHALL BE INSTALLED SS OPEN CABLING P y p
<br /> NEAR STRUCTURES AND WALLS OR AS SPECIFICALLY TGB TELECOMMUNICATIONS GROUNDING BUSBAR
<br /> NOTED ON DRAWINGS. SEE SPECIFICATIONS FOR G GROUND TIA TELECOMMUNICATIONS INDUSTRY ASSOCIATION PROJECT
<br /> SUPPORT REQUIREMENTS. GB GROUND FAULT CIRCUIT BREAKER TMGB TELECOMMUNICATIONS MAIN GROUNDING
<br /> GF GROUND FAULT CIRCUIT INTERRUPTER BUSBAR
<br /> 11. PROVIDE FIRESTOPPING SYSTEMS FOR CONDUIT AND GFP GROUND FAULT PROTECTION TP TAMPERPROOF 2023-056
<br /> RACEWAY SYSTEMS AT PENETRATIONS,SLEEVES GND GROUND TR TELECOMMUNICATIONS ROOM
<br /> AND SLOTS OF FIRE RATED CONSTRUCTION FOR GRS GALVANIZED RIGID STEEL TTB TELEPHONE TERMINAL BOARD
<br /> HORIZONTAL AND INTRABUILDING PATHWAYS AND TV TELEVISION •
<br /> SPACES. HC HORIZONTAL CROSS CONNECT TVSS TRANSIENT VOLTAGE SURGE SUPPRESSION
<br /> HID HIGH INTENSITY DISCHARGE TYP TYPICAL MARK DATE DESCRIPTION
<br /> 12. INTRABUILDING OPTICAL FIBER CABLING SHALL BE HP HORSEPOWER
<br /> CLEARLY AND VISIBLY IDENTIFIED IN PULLBOXES, HTR HEATER UG UNDERGROUND
<br /> ENTRANCE POINTS,EACH RISER ROOM,AND 5'-0" Hz HERTZ ILL UNDERWRITERS LABORATORIES
<br /> BEFORE ENTERING A FREE STANDING RACK UTILIZING UON UNLESS OTHERWISE NOTED
<br /> AN OPTICAL FIBER CABLE MARKER TAG SYSTEM. IBC INTERNATIONAL BUILDING CODE UPS UNINTERRUPTIBLE POWER SUPPLY
<br /> IC INTERMEDIATE CROSS CONNECT USB UNIVERSAL SERIAL BUS
<br /> 13. CATEGORY 6/6A CABLING:MAINTAIN A MINIMUM IDF INTERMEDIATE DISTRIBUTION FRAME UTP UNSHIELDED TWISTED PAIR
<br /> SPACING OF 12"FROM ELECTRICAL FEEDERS AND INSTITUTE OF ELECTRICAL AND ELECTRONIC UV UNIT VENTILATOR
<br /> BRANCH CIRCUIT WIRING AND 12"FROM AUXILIARY IEEE ENGINEERS
<br /> SYSTEM CABLING. IG ISOLATED GROUND V VOLTS
<br /> IMC INTERMEDIATE METALLIC CONDUIT VA VOLT AMPERES PROJECT
<br /> 14. MINIMUM SPACING FROM ELECTRICAL APPARATUS
<br /> SUCH AS MOTOR DRIVEN EQUIPMENT AND ISDN INTEGRATED SERVICES DIGITAL NETWORK VFD VARIABLE FREQUENCY DRIVE
<br /> PRINCIPAL IN CHARGE:I BMI
<br /> TRANSFORMERS SHALL BE 6'-0". SPACING
<br /> PROJECT MANAGE
<br /> REQUIREMENTS SHALL APPLY TO OPEN CABLING J JUNCTION W WATT;WIRE R:
<br /> PROJECT ARCHITECT.I-
<br /> PATHWAYS WHERE EQUIPMENT IS LOCATED ON THE
<br /> W/ WITH JOB CAPTAIN: I-
<br /> SAME FLOOR,FLOOR ABOVE,FLOOR BELOW,OR IN KCMIL THOUSAND CIRCULAR MILS W/O WITHOUT
<br /> ROOMS ADJACENT TO SUCH EQUIPMENT AS THOUGH kVA KILOVOLT AMPERE DRAWING
<br /> WA WORKSTATION AREA
<br /> A WALLS AND FLOORS DID NOT EXIST. EXCEPTION: KVAR KILOVOLT AMPERE REACTIVE WAN WIDE AREA NETWORK A
<br /> BUILDING CONSTRUCTION THAT RESULTS IN kW KILOWATT WG WIRE GUARD ELECTRICAL
<br /> CONTINUOUS METALLIC BARRIER BETWEEN LAN LOCAL AREA NETWORK WH WATT HOUR METER ABBREVIATIONS AND
<br /> ELECTRICAL APPARATUS AND CABLE PATHWAYS WP WEATHERPROOF
<br /> SHALL BE CONSIDERED AS SUITABLE SEPARATION. LCP LIGHTING CONTROL PANEL
<br /> LEC LOCAL EXCHANGE CARRIER XMFR TRANSFORMER GENERAL NOTES
<br /> LT LIGHT
<br /> LTG LIGHTING
<br /> Y WYE
<br /> M METER Z IMPEDANCE
<br /> MAN METROPOLITAN AREA NETWORK ,
<br /> 1 2 3 4 5
<br />
|