My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3700 FEDERAL AVE PORTABLE 6 JACKSON ELEMENTARY 2025-08-07
>
Address Records
>
FEDERAL AVE
>
3700
>
JACKSON ELEMENTARY
>
3700 FEDERAL AVE PORTABLE 6 JACKSON ELEMENTARY 2025-08-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2025 2:30:29 PM
Creation date
5/1/2025 3:02:07 PM
Metadata
Fields
Template:
Address Document
Street Name
FEDERAL AVE
Street Number
3700
Unit
PORTABLE 6
Tenant Name
JACKSON ELEMENTARY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CW-2 SIU ACiCi?' <br /> INSTALLATION CLASS 2+3 <br /> Patent#6,871,455 <br /> The Nu-Concept GW-2 Anchor combines a patented elongated hole in the tension <br /> head with a stabilizing and compaction cap with drive rod guides. When combined <br /> with a grade 5 bolt, the anchor will rotate in all directions allowing adjustment to uneven <br /> terrain. Under load conditions the cap, rotates down ward in the direction of the pull, <br /> causing a double compaction of the soil and laterally restricts movement of anchor <br /> through the soil. Turn cap to position the drive rod guides facing away from the home. <br /> Insert 30" rods and drive to full depth into the soil. <br /> Attach stabilizer/compaction cap to the tension head of the anchor. This is done by sliding the <br /> 'cap over the top of the tension head, aligning 9/32" holes in cap with 1/4" elongated hole in <br /> tension head. Insert 1/4"x 2-1/4", grade 5 bolt(included). Hand tighten. Cap must be installed <br /> at any time prior to ground contact. See Cap Figure A and Tension Head Figure B. <br /> Figure A Figure B II The Drive Machine is started and the anchor is <br /> 1I (TOP) turned into the ground to a point where the bottom <br /> 111.11.1bD ❑ of the tension head is at or slightly below ground <br /> (BOTTOM) <br /> 0 level. At this point, the drive rod guides on the top of <br /> --- the cap should be slanted away from the outer wall <br /> Class 2 Difficult Soil of the home allowing the installer to drive the rods <br /> from the outside of the home. This insures <br /> Figure C maximum soil compression by the cap. See Figure <br /> C. Engineered to allow ground anchor to be <br /> installed at a slight back angle of 15° <br /> Stabilizer!Compacting <br /> Head <br /> '.� 2-30"Rods Class 2 - Difficult Soils <br /> in <br /> Stabilizer/Compacting <br /> � / Head !, <br /> III, Anchor is pre-loaded. Pre-load causes Figure D <br /> ilio\ <br /> the cap to rotate downward in the <br /> direction of pull, further compacting the <br /> soil and presenting a larger surface <br /> area, resisting both horizontal and <br /> vertical movement. See Figure D. <br /> When used with rigid support tubes, <br /> rather than strap systems, pre-loading is <br /> not required. <br /> Note: A special adapter is available to insure against tension head and bolt damagE 0 � <br /> Revised 3-14-07 <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.