My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1820 100TH PL SE PUGET SOUND HEARING Plans 2025-05-02
>
Address Records
>
100TH PL SE
>
1820
>
PUGET SOUND HEARING
>
Plans
>
1820 100TH PL SE PUGET SOUND HEARING Plans 2025-05-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2025 10:20:41 AM
Creation date
5/2/2025 10:20:07 AM
Metadata
Fields
Template:
Address Document
Street Name
100TH PL SE
Street Number
1820
Tenant Name
PUGET SOUND HEARING
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b <br /> , ' � P,�z��rs� <br /> 804—MILLWORK TRIM <br /> Scope of Work <br /> • Contractor wiil replace base trim, where damaged or removed to repair framing <br /> • Contractor will make an effort to match the existing trim profile <br /> • All interior finish trims will be paint-grade MDF or finger jointed pine <br /> • No crown molding to be reinstalled in North Office <br /> 9040— Ductwork <br /> Scoae of Work <br /> Provide the following. <br /> • Clean drywall debris, due to damage, from inside ductwork <br /> • Contractor to clean the ductwork accessible from the interior rooms where the work is occurring. This <br /> work will utilize a shop vacuum to clean the end 2 feet of ducfinrork that is accessible through the grill <br /> opening <br /> • Reinstall existing grill covers <br /> ELECTRICAL <br /> 10010—ELECTRICAL <br /> Scope of Work <br /> Provide the following. <br /> • Temporarily move electrical wiring and outlets in order to preform framing repairs <br /> • Restore electrical wiring and outie#s and lights to pre-damage condition <br /> • Outlets will remain in existing locations <br /> 10010—LOW VOLTAGE <br /> Scoae of Work <br /> Provide the following. <br /> • Temporarily move low voltage (internet and telephone and alarm system)wiring and outlets in order to <br /> preform framing repairs <br /> • Restore low voltage jacks to pre-damage condition <br /> • Restore alarm wiring to pre-damage condition <br /> Not Included in Contract <br /> • Relocating and/or upgrading of existing electrical service, main panel and subpanels. The existing <br /> electrical system is assumed to be competent <br /> • Replacement of existing knob and tube wiring (contractor assumes no knob and tube wiring is <br /> present). Contractor assumes existing electrical lines and circuits in the remodel have been installed <br /> as per code. The presence of knob and tube requires the Contractor to replace all affected wiring to <br /> the circuit breaker with an approved wire (i.e. Romex)as required by code. If replacement of knob and <br /> tube wiring circuits is required, additional electrical costs will be detailed and presented as a change <br /> order after demolition is complete and additional costs can be assessed. <br /> • Alarm system repairs, startup or service <br /> MISCELLANEOUS <br /> 1102-JOB SITE WALK-THRUS <br /> Scope of Work <br /> • Contractor and Owner will establish a weekly scheduled meeting at the job site during daylight hours to <br /> review progress discuss schedule and decisions required in order to keep job running smoothly and <br /> avoid delays <br /> , �Owner's Initia J� � <br /> _ ! <br />
The URL can be used to link to this page
Your browser does not support the video tag.