My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3321-13
>
Ordinances
>
Ordinance 3321-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2016 12:08:30 PM
Creation date
4/14/2016 12:08:29 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3321-13
Date
3/20/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> ..0,^1,;4'Ilim-rn' <br /> t444 .7./y <br /> ORDINANCE NO. 3321-13 <br /> AN ORDINANCE creating a special improvement project entitled, <br /> "Evergreen Way and Pecks Drive - Intersection Safety,"Fund 303, <br /> Program 099,to accumulate all costs for the improvement. <br /> WHEREAS, the City of Everett is committed to a planned traffic and safety improvement <br /> program; and <br /> WHEREAS, the City of Everett has identified the need and obtained funds to construct certain <br /> safety improvements at the intersection of Evergreen Way and Pecks Drive; and <br /> NOW, THEREFORE, THE CITY OF EVERETT DOES ORDAIN: <br /> Section 1: <br /> A special improvement project is hereby established as Fund 303, Program 099, entitled <br /> "Evergreen Way and Pecks Drive - Intersection Safety,"to accumulate all costs for the <br /> improvement. <br /> Section 2: <br /> Authorization is hereby given to accumulate costs and distribute payments from Fund 303, <br /> Program 099, for the improvement project. <br /> Section 3: <br /> Authorization is hereby granted for the "Public Works Director" or"City Engineer," under <br /> direction of the Mayor, to assume full and complete responsibility for conducting all tasks and <br /> doing all things to accomplish the actions authorized in this ordinance. <br /> Section 4: <br /> The sum of$411,000.00 is hereby appropriated to Fund 303, Program 099, "Evergreen Way and <br /> Pecks Drive - Intersection Safety," as follows: <br /> A. Estimated Project Costs <br /> Design and Construction $ 411,000.00 <br /> Total Estimated Cost $ 411,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.