My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1903 JACKSON AVE A, B 2025-10-24
>
Address Records
>
JACKSON AVE
>
1903
>
1903 JACKSON AVE A, B 2025-10-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2025 8:49:31 AM
Creation date
5/6/2025 11:08:51 AM
Metadata
Fields
Template:
Address Document
Street Name
JACKSON AVE
Street Number
1903
Unit
A, B
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EROSION CONTROL ELEMENT # 8 - Stabilize Channel and Outlets. <br />Requirements — Stabilize Channel Outlets <br />1. All temporary on -site conveyance channels shall be designed, constructed and <br />stabilized to prevent erosion from the expected peak 10 minute velocity of flow <br />from a Type IA, 10-year, 24-hour frequency storm for the developed condition. <br />Alternatively, the 10-year, 1-hour flow rate indicated by an approved continuous <br />runoff model, increased by a factor of 1.6, may be used. <br />2. Stabilization, including armoring material, adequate to prevent erosion of outlets, <br />adjacent stream banks, slopes and downstream reaches shall be provided at the <br />outlets of all conveyance systems. <br />The following Best Management Practices, (BMPs), the ones that the Contractor will implement on <br />site, to meet the erosion control requirements listed above: <br />❑ Channel liningBMP C202 <br />❑ Outlet protection —BMPC209 <br />❑ Other <br />✓ Not Applicable —See explanation below <br />Actions will be taken to accomplish these requirements and objectives, given the unique <br />circumstances of the project and or site. <br />No storm drainage channels such as a ditch will be constructed, either temporary or permanent. <br />There are no existing channels or ditches within the project area. <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.