Laserfiche WebLink
❑ Concrete HandlingBMP C151 <br />❑ Sawcutting and Surfacing Pollution Prevention—BMP C 152 <br />✓ Material Delivery, Storage Containment—BMP C153 <br />❑ Other <br />❑ Not Applicable See explanation below. <br />The BMPs selected to control the "Control Pollutants" erosion control element of the project <br />will be used to control pollutants and will be shown or added as a note on the SWPPP plan. <br />Actions will be taken to accomplish these requirements and objectives, given the unique <br />circumstances of the project and or site. <br />Any and all chemicals, liquid projects, petroleum projects, and other materials that have the <br />potential to pose a threat to human health or the environment will be covered, contained and <br />protected from vandalism. We will keep all such products either in a locked trailer or a locked, <br />leak proof container. <br />Any heavy equipment/vehicles will only be onsite temporarily. Any spills will be cleaned <br />immediately. <br />Fertilizers and pesticides will be applied per the manufacturers' label requirements for <br />application rate and procedures. <br />No pH modifying sources such as cement kiln dust, fly ash, concrete washing treatment, <br />curing waters, etc are anticipated; if however they are, we will contain and/or remove the <br />polluted substance from the site per manufacturer's recommendations. <br />17 <br />