Laserfiche WebLink
Does the Project result in 2,000 square feet, or more, of new plus replaced hard surface area? <br />OR <br />Does the land disturbing activity total 7,000 square feet or greater? <br />Yes IF No <br />Minimum Requirements #1 through #5 <br />apply to the new and replaced hard Minimum Requirement #2 applies. <br />surfaces and the land disturbed. <br />Next Question <br />Does the Project add 5,000 square feet or more of new hard surfaces? <br />OR <br />Convert Y4 acres or more of vegetation to lawn or landscaped areas? <br />OR <br />Convert 2.5 acres or more of native vegetation to pasture? <br />Yes <br />All Minimum Requirements apply <br />to the new hard surfaces and the <br />converted vegetation areas. <br />No <br />Next Question Is this a road <br />related project? <br />Yes <br />Does the Project add 5,000 square feet or more of new hard surfaces? <br />No <br />Yes NO Is the total of new plus replaced hard surfaces 5,000 <br />square feet or more, <br />Do the new hard AND <br />surfaces add 50% or does the value of the proposed improvements - <br />No No additional No including interior improvements - exceed 50% of the <br />more to the existing assessed value or replacement value of the: <br />hard surfaces within requirements. { q ) <br />the Site? • existing Project Site improvements (for <br />commercial or industrial projects) OR <br />• existing Site improvements (for all other projects) <br />YeS All Minimum Requirements apply to the new and replaced <br />hard surfaces and converted vegetation areas. Yes <br />who�� Flow Chart for Determining Requirements for <br />Redevelopment <br />Revised March 2019 <br />DEPARTMENT OFF <br />ECOLOGY- Please see http://www.ecy.wa.gov/copynght.html for copyright notice including permissions, <br />State of Washington limitation of liability, and disclaimer. <br />City of Everett Public Works <br />Small Project Stormwater Site Plan/Report — Sept. 2023 Page 5 of 40 <br />