|
LAND OF PEACE AFH LLC,
<br />GARGE CONVERSION
<br />A.F.H GENERAL NOTES GENERAL NOTES SYMBOL NOTATION
<br />WAC 51-51-C1i305ectlm R330- "family I`— eMDISTHEAUTHOROFTHESEPUNSMDCLAIMSACOPYRIGHTINTHESEPLANSANDTHEDESIGNSCONTAINED IN THERE
<br />R330.1 Gamral.mN:eclbn sM1Nl appN to dlnawN mnsiructetl 3G8.3.2sx+ng-up grab barn swing-upgrffi bars shall M ambmum LANs. THIS CLAIMIS MADE DNDER TrtlE ATOP THE UNITED STATES CODE AND ALL
<br />M TNSITIES AND FO3EIGN UW
<br />atlun family M1pnes aztl dl exiling smglefamlr M1«nes being err resent-ft of328incM1es In dnmM1frem trre rear wall. THESE COPY RIGHTED DRAWING FILES ME TO BE USED FOR REFERENCE ONLY.- VTAKE NO RESP.NS BIURY FOR Axvs O WO HUNNL T
<br />hmiry Mines lTKI, by me rated Wpszlt'm- un R330.84 G,ab bars al bNM1W Section td dv«Awl gmb bars CHANGES MADE TO THESE DOCUMENTS BY MOTHER PARTY AND NO MCENSE IS Gry NFOR TRANSFER OF THESE COPYRIGHTS H' a -Ns l
<br />gran wparlmsnl Pf amid M1all meat iher u4.-d TO MOTHER PARTY. O WOOprpaglNO A�W
<br />and M1eanM1 services pi«bJuly 1, 20pt. H3308A.1Vesbal grab bars. Vertical gab bars sM1NlMaminimum OOIWnMEDMFMBFM MTTMSUUIYM
<br />REC N.A.ved. d 18 imflas bng aM installs] at me control ad wall and Mffi ad g1iB(ly
<br />R330.3 SI mEacM1 sl In an elan all. Grab Mrss thi.4 nt withintl alb fine eTA, lM CONTRACT GENERAL NOTES
<br />amity Mines sM1nallrbe claz iffi azl: eeping room th.- edge orwfmin 4'mcS wnM1in tfe bAM,6. TM1e bottom entl of FF. C�� Fowl ®� T
<br />1.Tyro S.WM1ere lM maansdwgreas cadains stairs, elsralas, bEPTIO shN baM,i 361.ldg aM 421ncM1es abmre lbor grade. THESE GENERAL NOTES PERTAIN TO THE WORK DESCRIBED ON ALL CONTRACT OOGUMENTS. �--� voraLvunM
<br />p,Tl N fins. EXCEPTION TM reguireaveg th.grab barcan M subslnuiNUCi a -I WORK COMPRISES THE COMPLETED CONSTRUCTION REQUIRED BY THE CONTRACT DOCU MENS AND INCLUDES ALL LABOR BIYAI[)1 3f- g00f 40N CMOs
<br />2 rpe g_"R pr¢mearisdepess is dgratle level pre r'9 grab bar mewling me reyiremenis of Sadlm R3258d NECESSARY TO PRODUCE SUCH CONSTRUCTION, AND ALL MATERIALS AND EQUIPMENT INCORPORATED OR TO BE INCORPORATED
<br />uc whin accordance wim R330.9 ispmtlad. 1M1e v[ RD65IOPEpLW _ - COMCRFIF
<br />3. Type N52-WM1ereiwo meansdegress aredgretle level or wniroleM aM M1wtl entl emry polls. IN SUCH CONSTRUCTION, 9t%E
<br />r ucletlmacmrhancewith F-A are pmdad. R3x.S42 Hpi Wgrffi bare Hpazanfal grffi bars sMlMprwNedd ETHIC CONTRACT DOCUMENTS CONSIST OF THE OWNERCONTRACTOR AGREEMENT, THE CONDITIONS OF THE CONTRACT 2 MDNOSHlIOM 'O DWnSYMMi EIfS
<br />R330: mTnypes dlmkirg a-l- ana awr ac4va,im. All tearoom entl dens,M1ea'I«d dU,ebackwallwnbin,MbalMub
<br />bdmmm dears seal be apen111-lfe «Aside wM1en lwketl. area.Orab bars 1 be mwmffi between 33 inches artl 36 ircbw (GENERAL, SUP PLEMENTARY, AND OTHER CONDITIONS), THE DRAWINGS, THE SPECIFICATIONS, AND ALL ADDENDA ISSUED PRIOR CUT
<br />set aM1sll M-W opwnaue from the insidw. =I O AND ALL MODIFICATIONS ISSUED AFTER EXECUTION OF THE CONTRACT. WMOMSYMBO �TLTrT CypF/FAPDI
<br />O-UP wasdaaarbtg PUIIa,IMCMa, ticks, aM otM1er P«paaen Gs entl ana M1earl ad grab bare s 1 M 24 iwM1es CA WORK IS TO CONFORM WITH TIECONTRACT DOCUMENTS. DRAWINGS ARE NOT TOBESGLEOFOR INFORMATION IF UNABLE
<br />Ash ln-i family M1«nws sM1NlMaperffila wim one minima gm. Back wall grab bar sM1M be36 incMs minimum In TO LOCATE DIMENSIONS FOR ANY ITEM OF WORK, CONSULT WITH THE DESIGNER BEFORE PROCEEDING WITH CONSTRUCTION. WALLS:CTMXM /1 �� Y _.. a�^`..�, _� QMyM
<br />M1antl and sMl rotreprire ibM1t grasping.F-NP, prtwistmgd lM IerM 1. Art Ir1�%
<br />wrisLP gtloors shall M1ave grazpabb M1artlware avdlffile wM1m in R..SE Grab bars ASM1ower coals. Wl-sI-malls are prwiaffi D. SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES ARE NOT PART OF THE CONTRACT DOCUMENTS. THE DESIGNER WILL REVIEW _
<br />ThImetl pr open position. meet the reguiremrxdsw MmirO facilhies, grab bars sMl meet THEMBUTONLYPERCONFOHMANCE WITH THE DESIGN CONCEPT OF THE WORK AND WITH THE INFORMATION GIVEN IN THE pgON5E0 - 6YPiLM eDA�
<br />eiome rwuired to wlivde operable Parts shill M Go pwnds DETAlGLI011r COITOUAl1NE
<br />(22.2 Nf maximum. Required ax6 doors shall Nava no atldltimdlacking the uiremm,s d8wlim R3308. GONTPAGT DOCUMENTS. THE CONTRACTOR NOT BE RELIEVED OF RESPONSIBILITY FOR ANY DEVIATION FROM THE AS, rz Cyp5LM S3fATf1f
<br />EXCEPTION: SMwvr stalls wiM1 ant lb.. -in seals are nq, uired to REQUIREMENTS OF THE CONTRACT DOCUMENTS BY THE DESIGNER'S REVIEWOFSHOP DRAWINGS, PRODUCT DATA ORSAMPLES. F15TANG
<br />Vices. M1ave verlbd a M1aeoMd gmb bars at the seat entl wall. A vmicol ibor I 1 CONTOUR..
<br />grettlM1e bu r�r ware al unbck Inside aM ogsiaemwM1anisms wfien ,ab bar Mell be insidletl w'AM1ln di- d lM edai« d lM1esMwa E. THE CONTRACTOR SHALL PURSUE WORK IN A CONTINUOUS AND DILIGENT MANNER TO INSURE THE TIMELY COMPLETION OF THE OTQIIEDSTMIO
<br />wxnm Wmm fM adpn tamer Mmw ydlMM row pawda Io ceiling oAo _UNI Bvfm
<br />Hal knun,4 alignetl wdh row nose d row built-in seat PROJECT.
<br />R330.5 Emoke, carbon mwoxbe darm,wuirem«Is. All elan farniN R330.8.5.1 Vasicd gmb bars. Vasicd grab barssM1all ba,eimMs ASF MEVAIgMMMME q � ttWr00DSHFATN6
<br />b.ui pad wim smoke ana carbon-nmaa A.-nldled as min mummlengm ana lns,alletl at me cpmroleM wall ana M1eatl ena F. THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK USING HISMER BEST SKILL AND ATTENTION, -HE SHALL BE
<br />coulred'md5ecilPns R3lA entl R315.1. Narms shall Minsmlled walL X. barss 1be-Y. wehin 4 lncltws of IM1e wxlabr SOLELY RESPONSIBLE FOR ALL CONSTRUCTION MEANS,METHODS, TECHNIOLES, SEQUENCES, AND PROCEDURES AND FOR ■
<br />in
<br />sucM1amanna so and row dMwetim awvicw warning is waive I.. dine sM1mar hall o, withinalncM1es imitle me snorer ma11.TM1e COORDINATING ALL PORTIONS OF THE WORK UNDER THE CONTRACT. NAl -_-_- CkNIBtlIE Mm1115UUTION
<br />a singe alarm. bgl«n eM dvertcal bars moon, MNveen 361nc ana 42'Pc RN1IE6
<br />R330.6 Escapewintlmsentl tlp«s'Evay slwping roan sM1allMprw+tlffi above floor papa. G. THE CONTRACTOR SHALL CAREFULLY STUDY AND COMPARE THE CONTRACT DOCUMENTS AND SHALL AT ONCE REPORT TO THE
<br />ROEVE
<br />wgM1emergencyetA, inarwscua winaty lrs mpw.,Salbn R310. N 0.8 2Z20/2pZ3`NAC51-51-033UPage2 DES IGNERATANYTI R IWITHO BTCONTRA CONTOMISSRACT
<br />MEANSNS HE MAY DISCOVER, THE
<br />CONTRACTOR SH PCRAWIORMN RODUC DAT
<br />raisetl pWdarms or R330.dth Haizadal grffi bare. Hpazonid gr--sM1 36 imldbdmM OR SAMPLS FOR SUCH A PORTION OFTH EWE DOCUMENTS OR, WHERE REQUIRED, APPROVED SHOP DRAWINGS, PRODUCT DATA, -
<br />aiazgacea bymeopen ngsw she approves as meerng tMs stlesdmesM1ax«s,al mounlei beMeen 33'ncM1es aM 36 OR SAMPLES FOR SUCHa PORTION OF THE WORK. _Q �QWD% -6�- fASIIE
<br />I-lyRSSD7F M1azas-Poorgarfe.IlH gab barssMM nmaximum SIEa
<br />elapparI access roads and wafer suppY mriire P,omcgm. Atlun ad ac walls. Haizpdd X. bars sM1all nil lnlafere wile - ___ (I�WH`YHOm -E-E- NCCTpCALUE STOLE
<br />hmiry Vwmes mallMsaved by lire apparatus access mvaNzs. H. THE CONTRACTOR AT ALL TIMES SHALL KEEP THE PREMISES FREE FROM THE ACCUMULATION OF WASTE MATERIALS OR +-lu-law�lea`I
<br />roads entl wafer supplies mwgng IM1e rwuirerr«Isdmelowljurisdictim. m. AIIIMesa and exleaa ramps, when pwNded aM1sllM RUBBISH CAUSED BY HASHER OPERATIONS. AT THE COMPLETION OF THE WORK, HE/SHE SHALL REMOVE ALL HIS/HER WASTE T
<br />R330.8 Grab Mrgeneral rewiremenis. WM1aefacilitiesai aeslgndetl wndm cad lnamMance with SeMbn R311.8 wimamaNmumalpped MATERIALSANDRUBBISH FROM AND ABOUTTHE PROJECTAS WELL AS ALL HIS/HER TOOLS, CONSTRUCTION EQUIPMENT,
<br />vertical M l2 Mazpnld. TM1e emegbn iP Section R311.8.1 is nq MACHINERY, AND SURPLUS MATERIALS.
<br />bdfsubsYana sM1oxer mills sM1d�be insalletl accoNP9IOIcoM1islseclion. wll-la ffiM mmgy Mines. Handrails shall belnsldled lnxcokame wlM1 ��- SWTAM'SFWBI �- Y/OCO HBI
<br />e., Grab bar cans section. Grab bars wim a dreular crass Salim s 1 M1ave Sectlm R..0 A. I. WHERE CONFLICTS OCCUR, COORDINATE THE LAYOUT AND EXACT LOCATION OF ALL PARTITIONS. DOORS, TELEPHONES, AND IT
<br />oudide dames«oft,/d lncM1 minimum entl 2'mcM1az RS309.1 H�NraiIs for �Ps. H-Wil,s 1beis INE on bgM1 ELECTRICAL/COMMUNICATION OUTLETS AND SWITCHES W I'm THE DESIGNER IN THE FIELD BEFORE PROCEEDING WITH
<br />mimLl
<br />um. Grab bars wim nmcircular cross sec,im sM1al Mreacrws I,-Pfram beNveen sIXA d, vasicd to 12 INY-1d andt CONSTRUCTION.
<br />tin hlmensim of 2lncM1es maximum ana apeamda dma Pf balaM 20 M1aizpnid in wcPMazce w'AM1 3w1'4,451311.83.E
<br />ccM1es minimum antld 518lncM1es maximum. ihrpugM1 R31,.8.3.3. J. THE CONTRACTOR SHALL GUARANTEE ALL WORK AND MATERIALS TO BE FREE FROM DEFECTS FOR A MINIMUM OF ONE YEAR I -W�%- WAIMtIK
<br />CmiR.e 2l20/2023 WAC 5151-GH30 Pate 1 R 01051dr ireatls entl risers. Sldrtrwas ad risers sMlMcpmbuclffi in FROM THE ATE OF FINAL ACCEPTANCE, AND PROMPTLYREMEOY SUCH DEFECTS AND ANY SUBSEOOENT DAMAGE CAUSED BY THE
<br />R330.8.2 Grab baindallmipn. Grffi bars shall h- a spacing d t azm,dance wM Sw1ionRif 1.]S. Hana,aib sh. Mimidlffi In we«tlawe DEFECTS OR BEPAIR THEREOF, AT NO EXPENSE TO THE oWNER. GUARANTEE PERIODS OF GREATER THAN ONE YEAR MAY BE
<br />111- between IM1e wall and IM1e bar. Pmjwg,M A—1 wRM1S t-R33010A. REQUIRED AND CONTAINED WITHIN THE CONTRACT DOCUMENTS,
<br />valves ana Mmtub a shwa still ax:Murs iwdures shwa, Mlax aM R33010.1 A -WIN fg Ireatls ana rises. A-6 shall M insmllne m MM1
<br />M1e mtls dlM1e grab bar sM1al M1ave aclear spaced 11l2 incM1 to was dteaas ana nsars numbairM tram marisar to K. THE CONTRACTOR SHALLBE RESPONSIBLE FOR THE ACTS AND OMISSIONS OF HIS/HER EMPLOVEES,SUBCONTRACTORSAND
<br />th,EXCEPTION:Swim-up grffi bars sFell nil Mrequiretl to meet that tl2 inch R31t�17.8s�M1rwgM1 R311sM1BIAM insidMdbacoakance wgM1 Saclipns THEIR AGENTS AND EMPLOYEES, AND OTHER PERSONS PERFORMING ANY WORK UNDER A CONTRACT WITH THE CONTRACTOR.
<br />330.,ls1ower-l-.. Pr... roam the requiremeMSN L. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE LOCATION AND/OR PROTECTION OF ALL EXISTING AND PROPOSED PIPING, ENERGY CREDIT
<br />Grab barscosM1sll M1aveasWdurd siragmd250 rounds applietl baing facilities, I.minimum size of $lww«stw$ i«an atlun UTILITIES, STRUCTURES, ADJACENT STREETPERIOD
<br />S, AND IMPROVEMENTS DURING THE PERD OF CONSTRUCTION.
<br />an a Tab bar. fastener, mounting awice or supposing family tune shWIM 30 iwaz weep by 48'rcM1w bng.
<br />uc1uM memb«. orab bars sM1all nW be supported directly by any M. WHERE PRE -MANUFACTURED OR PREFABRICATED ITEMS AND/OR MATERIALS ARE TO BE INSTALLED -THE CONTRACTOR SHALL
<br />rsesdeMid gretla fiberglass barring or sM1vwering unit. AcMic bars VERIFY ROUGH OR FINISHED DIMENSIONS IN THE FIELD PRIOR TO PURCHASE OR FMRICAnON. 2OI8 Wasdrgion SmM Eneyy C«3e-Resid¢rrfivl
<br />I- in Nwing udls $
<br />M1all be remwetl. axlvoR MATERIAL IS INDICATED IN THE CONTRACT DOCUMENTS, AND NOT NECE3SARILY DETAILED IN EACH PrvmrMrve Err..gy Udx�&dumefpr All,imate inry inwasMrWlon
<br />Fred'N.r, grab bars, wM1wnmwnlwd, sM1M rwirdms, spina N.WHEREANY ITEM 9rMh FrNN_ AeduorM leTTxdAm F¢Muary 1, ARI)
<br />core aM M1aveagraspablw suexafinisM1. SPECIFIC CASE, BUT IS REQUIRED FORA COMPLETEANDPROFESSIONALINSTALLATIONSUCHREMAND/ORMATERIALSHALLBE EacM1 swelling unitmdzesiderravl builein9 sM1allmmpw wieM1 suHicientmMnzfrom Table Ra06.2IMN
<br />R330.53Greb Mrs at water clw Wdar closets sM1all-grab PROVIDEDAS IF SHOWN ISRE. DETAILED IN FULL. PROVIDE MEANS TO FURNISH AND INSTALL anal aTon cretlilSl one Tabk 4063fenergy «etli[s)Io acM1iwelM1e followi herM
<br />bars mpunred an taro slaws. Grffibar .,,b .binm ndfixed z ng minimum num
<br />im aril swing -up bars. Grab bars 1meetlM r« iremmis of O. UNLESS OTHERWISE PROVIDED IN THE CONTRACT DOCUMENTS THE CONTRACTOR SHALL SECURE AND PAY FOR THE BUILDING petlM�io claim[M1H credL the bu Jeing permrterawings sM1all spedfytM1e option selectee entl Mle
<br />section R330.e. Grffi bars sM1Nlmwnl between 33 inches entl 36 incMs PERMITANO FOR ALL OTHER PERMITS AND GOVERNMENTAL FEES,LICENSES, AND INSPECTIONS NECESSARY FOR THE PROPER X",IMair leakage and sM1ow me gmlifying venlfbtfpnd32tem A. its mMrd sequmm
<br />above I., reds. Centerline d,h bwRvwwn grffi bars, regakbss EXECUTION AND COMPLETION OF THE WORK. ofa perauonstee
<br />e used, still M bdwem 25 inclres minimum entl 30 imles minimum. P. IN THE EVENT CERTAIN FEATURES OF THE CONSTRUCTION ARE NOT FULLY SHOWN ON THE CONTRACT DOCUMENTS, THEN THEIR L-11_UfrM ud:3 creels
<br />R33U.8.3.,1 pmgipn grffi taro. Fi-pmitbn pffi hass 1M GONSTRUCTION SHALL BE OF THE SAME CHARACTER AS FOR SIMILAR CONDITIONS THAT ARE SHOWN OR CALLED FOR AND SHALL
<br />RN -in I« th start 12 iwlles Irem the rear elling untts less man 1,500 rtinmMmoretlflmrarea wrcM1 lessthan 300mofhrertmmnar®.
<br />umd36 aM BE REVIEW ED BY THE DESIGNER. ding MiNingMdare grafter llran 500 ztMNea[ea floor area Wless Wn1,500 sF.
<br />wNl afro Q. U_ WORK SHALL BE PERFORMED WITHIN STRICT CONFORMANCE TO THE MINIMUM STANDARDS OFTHE CURRENT EDITION OF 2' MI_I..weJlfng U,,UF «Efts
<br />THE INTERNATIONAL BUILDING CODE AND ALL APPLICABLE NATIONAL, STATE, AND LOCAL LAWS, REGULATIONS, AND ORDINANCES. Nldwellingunes U. are nil irclWMin R3 or 03
<br />3. bra DwdgrM Ud: T «edits
<br />R.THE CONTRACTOR SHALL ALL BE RESPONSIBLE FOR GENERAL SAFETY DURING CONSTRUCTION, AND ALL WORK SHCONFORM TOrg�a'^l=upss effiaceedngOYp dmM[Noned Poorarea
<br />- PERTINENT SAFETY REGULATIIXNs. A.
<br />M other adEmsd sMII meet 1-3 above
<br />- __--- S.THE CONTRACTOR SHALL COORDINATE LOCATIONS OF ANY AND ALL MECHANICAL TELEPHONE, ELECTRICAL, LIGHTING, AND 3L Prespipme rnnplanceuMsehm Tade 0.ap2.
<br />_ - PWMBING INCLUDING ALL PIPING, DUCT WORK AND COORDINATE ALL REQUIRED CLEARANCES FOR INSTALLATION AND 1.l whh mebbri ngmmikalbm:
<br />MAINTENANCE OF THE ABOVE
<br />PROM EED IN THE a faP, I—n M0.b w+
<br />\� TACIERUNLESS EQUISMOTHERWISE PROVIDED IN TF CONTRAEQUIPMENT,
<br />MAC THE MACHINERY,
<br />WATER HE SHALL PRIES, TRANSPORTATION,
<br />AND PAY MRAU_ LABOR, VAIRR elating sYs[em sM1all include pne Aline fdbwfrM:
<br />ERIAL,EQUIPMENT, TOOLS,CONSTriUCTKKN EQUIPMENT,MACHINERY, WATER HEAT, UTILITIES,TRANSPORTATION, AND OTHER , ova swarm newer -ma con man llNd091 or
<br />FACILITIES AND SERVICES NECESSARY FOR THE PROPER EXECUTION AND COMPLETION OF THE WORK : pdementfng a m,nnaum damadwmr Amrer. gdarrutabmNng
<br />U.WHERECONFUCT IS ENCOUNTERED BETWEEN THE CONTRACT DOCUMENTS THAT W ILL MATERIALLY AFFECT THE QUALITY OR t ssringsde8 [Mmnp30ro Lwb bgadmlMSebr Paging and
<br />NT OF THE WORK, SUCH CONFLICTSWALL BE RESOLVED TO THE SATISFACTION OF THE DESIGNER BEFORE THE AFFECTED 5.3 �o+150.CCl Armua114Hpmarced 0630gCMNeh Sdarwatm HeaSr¢ 1.0
<br />ITEMS AND/OR MATERIALS ARE PURCHASED, FABRICATED, ANCIOR INSTALLED.
<br />as ed Memvnd sDwce neat pump meetirM regdrcmmM d OAbpn3.3.
<br />SITE PLAN NOTES driece,m wingasM1 Pei„1M^°
<br />:pa�rym mtyp
<br />ADORESSA015 FRIDAY AVE. EVERETT. WA 98201
<br />PARCEL m OON68 N0100700
<br />LEGALDESCRIPTION: HEADLEES I ST ADD TO EVERETT BUORD-00 LOTS 7.8 A N 15FT VICINITY MAP
<br />OF LOT 9 LESS E 8FT THOF TO CITY EV PER SW D AF NO 8910090322 &
<br />j EXC TH PTN IF ANY LY SLY OFFENCE PRESENTLY LOCATED ON
<br />S IOFT OF SD LOT 9 EVERETT. SNOHOMISH COUNTY, WA
<br />1. THIS IS NOT A LEGAL SURVEY. PROPERTY DESCRIPTION INFORMATION ON THIS SHEET FOR GENERAL USE CNLY.
<br />2. CONNECT UTILITY EXTENSIONS TO EXISTING UTILITIES.
<br />CONTRACTOR TO VERIFY LOCATIONS OF EXTENSIONS.
<br />3. NO SITE DISTURBANCE PROPOSED.
<br />NOTES 1 BAYSIDE e01e[II BIOS COHPe
<br />NOTE: NOTE:
<br />MIS SRC R310.1 Emergency Escape and Rescue 907.2.10.51memmnw _
<br />Omnbg BIN- WMre mare I-Y.K.al r Rr.bM RIVERS-
<br />Baseme ,hM,dffiefficsaMwvarysbadmrmm bd 'M1"ma'dM
<br />shd M1ave not ass man me p,Pa a Par G 11 M1 h Ml be II
<br />_ escape ana rescue apaM1ng ffi"n ucM1ammna coal M1 I�
<br />-
<br />20181RC R3 0..21 d in d pk b till Ful EVeYr -
<br />ER M1 M1 rot M rwgdrffi wM1 'two al - Idba
<br />c LiPI m 5. arddl alarms sw a done alarm / Everett 17 Ho ��
<br />Thenet clear tl'mensbn b M1' TM alarm sM1MlM earryaW"b" Mal bedrmms war I... Chld
<br />on shd Magary by the d Mckg-cos eb wall Al -fining door MuSeurn "0 1
<br />IM1e erragerlwNl,rase apse i IM1e awed _ -I'
<br />'Irede TM net - deer MgM M1dl -- P
<br />Ihan 24 ncMs antllM nq char wd1M1 sM1a11 M nil
<br />Ercegim: Grffie flmr a below grade opffings shall - -
<br />- haves nq dearp iMdrM less man 5squarefeet
<br />a wg61RCMnina
<br />PDRTGARpµt� LOCATION
<br />ae,, a dM
<br />n a nm n
<br />Malream IXffi h
<br />amaR310.2.3.
<br />-
<br />wim S.-
<br />jj _Dtnmunhy_
<br />oArtTsMaruaJ. A�
<br />Goc
<br />PROJECT
<br />OWNER: GEGREMARIAM ALEMSHOWA & ZERERA
<br />TIGIST
<br />DESIGNER: ERMIAS HAILU
<br />erm ias@emddesignpractice.com
<br />emddesignpractice.com
<br />PROPERTY INFO
<br />ADDRESS: 4015 FRIDAY AVE
<br />EVERETT, WA 98201
<br />APN: 00468000100700
<br />LOT: 7,8, 9
<br />ZONE: R-1 SF
<br />I SHEET INDEX
<br />A0.1 TITLE SHEET S1.0 GENERAL NOTE
<br />A1.0 SITE PLAN S2.0 FLOOR FRAMING
<br />A2.2 FLOOR PLAN,
<br />DEMO PLAN &
<br />SECTION
<br />A3.1 ELEVATION
<br />A3.2 ELEVATON
<br />A9.1 DETAIL
<br />CODES
<br />BASED ON THE 20181.R.C, 2018 UPC, 2018 WA
<br />STATE ENERGY CODE, AND 2018 WA STATE
<br />OCCUPANCYGROUP
<br />R-3
<br />CONSTRUCTION TYPE
<br />VB
<br />FLOOR AREA ISF)
<br />EXIST. UPPER LEVLE
<br />EXST. LOWER LEVEL
<br />EXIST. ATT. GARAGE
<br />CONV.GARAGE
<br />LIVING GARAGE
<br />1,286SF
<br />1, 114SF
<br />(440SF)
<br />440SF
<br />TOTAL LIVING AREA
<br />2,840SF OSF
<br />REQUIRED SEPARATION
<br />NO
<br /># OF STORIES
<br />2
<br />FULLY SPRINKLERED
<br />NO
<br />ENERGY NOTES
<br />ENERGY CODE COMPLIANCE SHALL BE AS PER
<br />THE WASHINGTON STATE ENERGYCODE 2018.
<br />MINIMUM INSULATION (R) VALUES OR U-VALUES
<br />OF COMPONENTS SHALL BE AS FOLLOWS:
<br />GLAZING, VERTICAL (U-VALUE) 0.24 MIN.
<br />DOOR, ENTRANCE (U-VALUE) 0.24 MIN.
<br />CEILING NSULATION (ATTIC) R-49 MIN.
<br />CELI
<br />LNG NSULATION (VAULTED) R-38 MIN.
<br />INSULATED WALLS R-21 MIN.
<br />SLAB EDGE R-10
<br />FLOOR R-10 OR R-7.5 MIN.
<br />ENERGY CREDIT NOTES (1.5 CREDITS Ni
<br />1. OPTION 1.1 (CREDIT 0.5) EFFICIENT BUILDING
<br />ENVELOPE
<br />2. OPTION 5.3 (CREDIT 1.0) EFFICIENT WATER
<br />HEATER
<br />I PROJECT DESCRIPTION
<br />Interior work (Maint level): Already existing AFH;
<br />propose converting the existing garage into a
<br />III space for an additional sleeping area and
<br />new bathroom.
<br />DEFERRED SUBMITTALS
<br />ELETRICAL, HVAC/MACHANICAL
<br />FIXTURES
<br />o r'
<br />J
<br />J
<br />2
<br />LL
<br />Q
<br />w
<br />W
<br />D-
<br />LL
<br />O
<br />0
<br />Z
<br />Q
<br />J
<br />LVA
<br />C)
<br />N
<br />TOA��
<br />VJ
<br />Q
<br />I-
<br />I-
<br />LLI
<br />cc
<br />LLI
<br />LLI
<br />LLI
<br />a
<br />LLL
<br />Y )
<br />T
<br />0
<br />It
<br />w
<br />T
<br />Q
<br />
|