My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1010 N BROADWAY 2023 STARBUCKS Plans 2025-06-30
>
Address Records
>
N BROADWAY
>
1010
>
STARBUCKS
>
Plans
>
1010 N BROADWAY 2023 STARBUCKS Plans 2025-06-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2025 1:12:03 PM
Creation date
5/7/2025 8:18:57 AM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
1010
Tenant Name
STARBUCKS
Permit
B2311-026
Year
2023
Notes
TI EXISTING STARBUCKS CAFE, PARTITIONS, EQUIPT RELOCATION
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
©2a23 STARBUCKS COFFEE COMPANY <br /> STARBUCKS° <br /> 2401 UTAH AVENUE SOUTH <br /> SEATTLE,WASHINGTON 98134 <br /> (206)318-1575 <br /> THESE DRAWINGS AND THE PROJECT MANUAL <br /> ARE CONFIDENTIAL AND SHALL REMAIN THE <br /> SOLE PROPERTY OF STARBUCKS <br /> NOTE: PVC adhesive(not provided)must CORPORATION,WHICH IS THE OWNER OF THE <br /> be applied wherever PVC couplings COPYRIGHT IN THIS WORK.THEY SHALL NOT <br /> -- --- --- ---- <br /> --- --- --- ---- and pipe are fitted together --., BE REPRODUCED(IN WHOLE OR IN PART), <br /> i' <br /> -- --- -- -— - r. SHARED WITH THIRD PARTIES OR USED IN ANY <br /> EXTENSANNER ON OTHER PROJECTS OR <br /> IONS TO THIS PROJECT WITHOUT THE <br /> .• J PRIOR WRITTEN CONSENT OF STARBUCKS <br /> CORPORATION.THESE DRAWINGS AND <br /> SPECIFICATIONS ARE INTENDED TO EXPRESS <br /> DESIGN INTENT FOR HI PROTOTYPICAL <br /> r STARBUCKS STORE(WHICH IS SUBJECT TO <br /> CHANGE AT AND--- -~ Ili wr:isi•".r� s�.n�' i NOT REFLECT <br /> ACTUAL SITE CONI DTIONS.DNE NEITHER PARTY <br /> II m SHALL HAVE ANY OBLIGATION NOR LIABILITY TO <br /> THE OTHER(EXCEPT STATED ABOVE)UNTIL A <br /> f-0 WRITTEN AGREEMENT IS FULLY EXECUTED BY <br /> i <br /> * •..+� BOTH PARTIES. <br /> --- - - w STARBUCKS TEMPLATE VERSION:2023.04.24 <br /> ARCHITECT OF RECORD <br /> rep,ation <br /> Figure 1. Loop area p preparation Figure 2. Loop layout and connections GRAPHITE <br /> • Flatten the loop(folded for shipping)as shown in Figure 2(1). Fit the pipe securely into the <br /> couplings(2). ]ay the loop flat in the drive-thru lane and position it as shown in Figure 2. GRAPHITE DESIGN GROUP,LLC,ARCHITECTS <br /> Elevate the loop on supports that are anchored to the ground,as shown in Figure 3. Level the 1807 7TH AVENUE,SUITE 700 <br /> loop so it will SEATTLE,WA 98101 be 2 inches(51 mmJ or less from the paved surface when the concrete is poured. (206)224-3335 <br /> Fasten the loop to the supports with wire,so it will not float when the concrete is poured. <br /> • Pull the loop wires through the PVC loop extension(4). Slide one end of the sleeve coupling(3) <br /> over the nipple on the corner fitting of the loop(5),and slide the end of the loop extension into <br /> the other end of the sleeve coupling. 9335 AEGIS D <br /> • Pull the loop wires through the elbow coupling(6)and the remaining 2 foot(.61 meter]piece of <br /> PVC(7). Slide the two ends(of 4&7)into the coupling(6),positioning the piece of PVC(7)so <br /> it points upward,out of the ground. Be certain it is next to and parallel to the outlets of the <br /> conduit coming into the speaker post or menu board from the building. <br /> r tse mml e.nr..,, r.m• STAlEMAROF WASHHILL <br /> NGTON <br /> NpWtor bop tl.url•[.of (pe9.25♦mm)_ <br /> ConeMa a•pMltpeorbnb Cy,yi�ay„ <br /> �..emm)� ��, batl•eultlirp <br /> ,u-xm <br /> e smra -=T <br /> Loop sup�porb ... . <br /> poet <br /> Figure 3. Side view of loop in asphak or concrete <br /> nVEHICLE DETECTOR LOOP SCHEMATIC 2 <br /> scam 12"=1'-0" <br /> O <br /> r } � <br /> 0 N <br /> ADJUST DETAIL AS REQUIRED BY go <br /> MANUF.FOR ILLUMINATED BOLLARD Q Q <br /> 36"z 3A ACCESS <br /> )MIN.CLEAR LLI � 0 ` <br /> CONCRETE AREA ACCESS S <br /> DOME (2)CONDUIT FROM DOS CL CL CL <br /> 2'-5" r -4'-2"(1270MM), 6'-1"(1854MM) 4 0"C✓; C' F- <br /> POST,ROUTE TO DRIVE THRU Q m <br /> 6"(150mm) WINDOW (737MM) 15'-2"(4823MM)MIN.CUR.AREA (1)CONDUIT, Z Q Q ~ <br /> I STEEL PIPE FILLED (1)CONDUIT FROM DOS ROUTE TO t- Z W <br /> t:I POST,ROUTE TO ELECTRICAL L) L) <br /> t=.{ WITH CONCRETE I ELECTRICAL LU 0 W <br /> 1=,I PANEL - PANEL I O EXPANSION I -F - 4------- ---}_______________---___ - IL > <br /> 7--------- CONCRETE D_ (r � <br /> JOINT(SEALANT) DOS POST 1 � 1 1/ FOOTING a m a — LU <br /> CL -I PAVINGOR NON-ILLUMINATED I - -FTF---- -11 / / MENU BOARD <br /> 4'-6" g0" I, ;I CONCRETE BOLLARD ON CONCRETE �I _ / 1 STORE#: 22817 <br /> (1372 M� / FOOTING. w 4 I -I; -I SLAB o I _ - � 1 1 PROJECT#: 60007-039 <br /> � L .l SEE DETAIL 2/A003 <br /> _---____-�-_�_�- L,I ^ 1 ISSUE DATE: 1012712023 <br /> ° I DESIGN MANAGER: GRAPHITE <br /> PRODUCTION DESIGNER:GRAPHITE <br /> R CONDUIT, m --1 m CHECKED ONBY. GRAPHITE <br /> v i ROUTE TO ._ = - = ? iv --- <br /> _ z ELECTRICAL <br /> -—-— PANEL III- .i .. _-r CONCRETE ry <br /> FOOTING BY GC Revision Schedule <br /> / I . rc 11 ' 1, " T (TYP.1 OF 2) I (1)CONDUIT,STUB UP FOR CANOPY LIGHTING, E BY Description <br /> o L'');.. CANOPY POST <br /> MENU BOARD ro O CONCRETE FILLEDCONCR Rev Date <br /> u- � I' J - 1 OUTLINE OF CANOPY ABOVE �~ I ROUTE TO SIGNAGE POWER <br /> EDGE OF CONCRETE FOOTING DATUM POINTS <br /> v z - v FOOTING w - � - I ( my <br /> �l 0 (1 NOTES: I 1.IF UTILIZING EXISTING FOOTING(S)FOR SIGNAGE REPRESENT CENTER OF(2)CANOPY BASE PLATES) <br /> 1 DIGITAL ORDER SCREEN DOS <br /> INSTALLATION,FASTEN TO EXISTING THREADED i1 (DOS)AND SPEAKER <br /> .... BOLTS AND PROVIDE CONDUIT AS NOTED. 1, EDGE OF CONCRETE CURB <br /> ENSURE BOLTS ARE IN SOUND CONDITION. 1 CONDUIT TO DOS POST <br /> CONCRETE BOLLARD EDGE OF )Imo, -I 2.IF ABANDONING EXISTING FOOTING(S)IN PLACE, I SHEET TITLE: <br /> p 40'-0"(12M)TO CENTERLINE OF 0 -T;1 f_0„III CUT CONDUIT AND THREADED BOLTS FLUSH TO DETECTOR LOOP EDGE CENTERED ON DOS POST 2"(51MM) <br /> FOOTING <br /> CONCRETE CONCRETE ARCHITECTURAL SITE <br /> FOOTING SEE DETAIL CURBD ORDER POINT MENU BOARD TOP OF FOOTING. d BELOW FINAL GRADE IN CONDUIT OR SAWCUT.VERIFY NO <br /> 21AO03 DIAMETER METAL IN SLAB WITHIN 36"(915MM)OF LOOP. DETAILS <br /> PRE-MENU 30 DEG CONCRETE BOLLARD DTE-5 PANEL 101 DT MENU BOARD DIGITAL ORDER SCREEN W CANOPY SCALE:AS SHOWN <br /> '- srrm 12"=1'-0" � scam 3!4"=1'-0" t sme.12"=1'0" SHEET NUMBER: <br /> A004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.