My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/05/07 Council Agenda Packet
>
Council Agenda Packets
>
2025
>
2025/05/07 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 10:12:03 AM
Creation date
5/8/2025 10:10:05 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/7/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> City Council Agenda Item Cover Sheet <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Project title: Request for Final Acceptance & Certificate of Completion for Evergreen Pump Station <br />Modifications <br />Council Bill # <br /> <br />Consideration: Final Acceptance <br />Project: Evergreen Pump Station Modifications, UP3747 <br />Partner/Supplier: McClure and Sons, Inc. <br /> Location: Evergreen Pump Station at Reservoir 3 <br />Preceding action: Contract Award – 3/30/2022 <br />Fund: 336 – Water & Sewer System Improvements Fund <br />Agenda dates requested: <br /> <br />Briefing <br />Proposed action <br />Consent 05/07/2025 <br />Action <br />Ordinance <br />Public hearing <br /> Yes X No <br /> <br />Budget amendment: <br /> Yes X No <br /> <br />PowerPoint presentation: <br /> Yes X No <br /> <br />Attachments: <br /> <br /> <br />Department(s) involved: <br />Public Works, Admin <br /> <br />Contact person: <br />Tom Hood <br /> <br />Phone number: <br />(425) 257-8809 <br /> <br />Email: <br />thood@everettwa.gov <br /> <br />Initialed by: <br /> RLS <br />Department head <br /> <br />Administration <br /> <br />Council President <br />Fiscal summary statement: <br />Original Contract Amount: $ 4,863,152.90 <br />Final Contract Voucher Amount $ 4,974,468.18 <br /> <br /> <br />Project summary statement: <br />The Evergreen Pump Station is a critical component of the City’s water transmission and <br />distribution system. This project includes the construction of a new electrical building <br />adjacent to the existing pump station, replacement of outdated electrical equipment, <br />seismic upgrades to the existing pump station building, and associated site work. <br />Recommendation (exact action requested of Council): <br />Accept the Evergreen Pump Station Modifications Project as complete and authorize the <br />Mayor to sign the Certificate of Completion. <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.