My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City of Mukilteo 5/5/2025
>
Contracts
>
Agreement
>
Interlocal Agreements
>
City of Mukilteo 5/5/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 11:54:15 AM
Creation date
5/8/2025 11:53:55 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
City of Mukilteo
Approval Date
5/5/2025
Council Approval Date
4/30/2025
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Interlocal Agreement between City of Everett and City of Mukilteo relating to Mukilteo Lane
Tracking Number
0004818
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Interlocal Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Interlocal Agreement – Page 1 of 4 <br />INTERLOCAL AGREEMENT BETWEEN <br />CITY OF EVERETT AND CITY OF MUKILTEO <br />RELATING TO MUKILTEO LANE <br />1.PARTIES <br />This Interlocal Agreement Between the City of Everett and City of Mukilteo Relating to <br />Mukilteo Lane (this “Agreement”) is made by and between City of Everett, a Washington <br />municipal corporation (“Everett”), and City of Mukilteo, a Washington municipal corporation <br />(“Mukilteo”). Throughout this Agreement, Everett and Mukilteo are each sometimes referred to <br />individually as a “Party” and collectively as the “Parties.” <br />2.PURPOSE <br />The Parties agree that: <br />Mukilteo Lane is a local access roadway that provides sole access to multiple Mukilteo <br />residences <br />Everett and Mukilteo corporate boundaries split the Mukilteo Lane Right of Way (R/W) <br />creating joint and adjacent operating and maintenance responsibilities <br />Plans, Specifications, and Estimates (PS&E) are needed for the roadway structural <br />improvements to ensure ongoing preservation of and access from Mukilteo Lane <br />Everett and Mukilteo would mutually benefit from PS&E for the needed improvements <br />Everett and Mukilteo have each budgeted or programmed $200,000 in 2025 toward <br />funding PS&E of up to $400,000 to outline the needed improvements. <br />3.PLANS, SPECIFCATIONS, AND ESTIMATES <br />Public Works staff from Mukilteo and Everett will work together to select an engineering <br />consultant, with Mukilteo complying with applicable requirements for contracting for such <br />services under Chapter 39.80 RCW or other applicable law. Mukilteo will execute a professional <br />services contract with the selected consultant. The scope of work for the contract is for the <br />consultant to develop plans, specifications and estimates for a public works project to preserve <br />the portion of Mukilteo Lane under joint Right of Way control from approximately 1315 <br />Mukilteo Lane to its intersection with Mukilteo Boulevard. Public Works staff from both Parties <br />by mutual agreement will add further detail to the scope of work during the contracting process. <br />4.THIRD PARTY BENEFICIARIES <br />There are no third-party beneficiaries to this Agreement, and this Agreement shall not be <br />interpreted to create any third-party beneficiary rights. <br />5.EFFECTIVE DATE, DURATION, AND TERMINATION <br />(a)Effective Date. As provided by RCW 39.34.040, this Agreement shall not take <br />effect unless and until it has: (i) been duly executed by both Parties, and (ii) has either been filed <br />with the Parties interlocal agreements website or recorded with the Snohomish County Auditor.
The URL can be used to link to this page
Your browser does not support the video tag.