Laserfiche WebLink
PUD Staff: <br />Form Completed By: <br /> Date: <br />City of Everett City of Evt Service Cntr 2024-11 L <br />Facility Type:Commercial - Medium Office 5K-50K SQ FT Facility Sq Ft: <br />Line <br /># <br />Heat <br />Source <br />Hours/ <br />Year <br />Existing/ <br />Proposed <br />Fixture <br />ID <br /># of <br />Fixtures Fixture Type <br /># of <br />Lamps / <br />Fixture <br />Lamp <br />Wattage <br />Ballast <br />Type <br />Watts / <br />Fixture <br />Qualified <br />(Yes/No) <br />Control Type <br />---------- <br /># of Sensors <br />Rebate / <br />(Fixt.) or <br />(Lamp) <br />Exist: <br />Prop: <br />Exist:T-8-32W 23 High-Bay 6 32W NBF 165.0 Occ <br />Prop:UFO 100 23 High-Bay 100.0 22 P <br />Existing Energy Use as a % of Facility Total Electrical Use: Total Rebate (100% Cost): <br />OR <br />Version December 2024 - Effective Date December 1st, 2024 <br />Existing: Notes / Other <br />Proposed: Mfg / Model # <br />Energy Services ● eebiz@snopud.com ● www.snopud.com <br />57,071 <br />Rob Marks <br />3/5/2025 <br />RLM <br />Lighting Input Form <br />For Energy Efficiency Projects in Commercial & Industrial Facilities. <br />3200 Cedar St Everett, WA 98201 <br />1 <br />Lighting Technology Maximum Rebate <br />Amount <br />Location <br />(Area/Room) <br />2 Yes2,600 PLTSolutions PLT- <br />13130 w/PIR sensor <br />$92/ea <br />(Fixt.) <br />$15.7/Sen <br />Warehouse Electric <br />Linear Fluor - 4' T8 <br />LED Fixture <br /> Notes: <br />Cost Information: <br />Fixture Material Cost <br />$1,901.23 -9.8%$2,089.46 <br />Labor Cost Misc. Cost (permit, etc.)Subtotal Tax Rate Total Bid Cost (incl. sales tax) <br />- <br />Total Material Cost <br />$2,089.46 <br />$2,461 <br />1% <br />PUD APPROVED <br />By RLM on 3/11/25 9:36AM <br />City of Evt Service Cntr 2024-11 L 2 of 3 3/11/2025