Colacurcio Brothers, Inc. 5/2/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Colacurcio Brothers, Inc. 5/2/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:39:54 PM
Creation date
5/8/2025 12:32:30 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Colacurcio Brothers, Inc.
Approval Date
5/2/2025
Council Approval Date
3/12/2025
End Date
9/9/2025
Department
Transit
Department Project Manager
Brad Chenoweth
Subject / Project Title
Everett Mall Bus Platform
Tracking Number
0004733
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Everett Mall Bus Platform <br />DIVISION C-CONTRACT <br />WO No – MALLSTN/24462 <br />CITY OF EVERETT, WASHINGTON <br />CONTRACT <br />THIS CONTRACT is made and entered into by and between the City of Everett, Washington, a <br />municipal corporation existing under the laws of the State of Washington (the “City”) and <br />Colacurcio Brothers, Inc. ( “Contractor”). <br />In consideration of the sums to be paid to it by the City, Contractor hereby covenants and <br />agrees to furnish all labor, tools, materials, equipment, and supplies required to complete in a <br />workmanlike manner the work, improvements, and appurtenances in accordance with the <br />Specifications and Plans and all other Contract Documents entitled: “Everett Mall Bus Platform” <br />(the “Project”). <br />1.Contract Documents. This Contract is the written agreement signed between the City and <br />Contractor and includes Division C – CONTRACT, Division P - PROPOSAL, Division B – BID <br />ITEM DESCRIPTIONS, Special Provisions, Contract Plans, Standard Specifications, Standard <br />Plans in effect as of the date Bids are opened, Addenda, supplemental agreements, change <br />orders, certifications and affidavits required by this Contract and by law, and Federal <br />requirements that apply to this Contract and Project, all of which are referred to as the “Contract <br />Documents” and all of which are hereby incorporated by reference. A copy of the Contract <br />Documents that were posted for the Project on Builder’s Exchange of Washington <br />(www.bxwa.com) as of Bid Opening Date is maintained by the City Clerk’s Office as a single pdf <br />and is available as follows: <br />Link to <br />PDF <br />https://lfportal.everettwa.gov/WebLink/DocView.aspx?id=1845588&searchid=880b19e2- <br />6ffe-4012-b06d-5e4bba37ff08&dbid=0 <br />Contractor acknowledges that Contractor has downloaded and reviewed this pdf prior to signing <br />this Contract. City and Contractor agree that this pdf contains all posted Contract Documents <br />as of the Bid Opening Date. City and Contractor further agree that this pdf may contain some <br />other documents (such as Reference Information) that are not Contract Documents. <br />2.Contract Time. Substantial completion shall be achieved within One Hundred (100) working <br />days after the effective date of the Notice to Proceed. Physical completion shall be within <br />Fifteen (15) working days after the actual date of issuance of substantial completion. <br />3.Liquidated Damages. The parties agree the City will suffer damage and be put to additional <br />expense in the event that the Contractor does not complete the work in all respects and have it <br />ready for use by the substantial completion date stated. Because it is difficult to accurately <br />compute the amount of such costs and damages, the Contractor hereby covenants and agrees <br />to pay to the City liquidated damages as computed in Section 1-08.9 of the Standard <br />Specifications, as may be amended by the Special Provisions, for each and every working day <br />required to accomplish substantial completion of the work in excess of the period established <br />above for substantial completion. For overruns in contract time occurring after the physical <br />completion date, liquidated damages shall be assessed at the rate computed in Section 1-08.9 <br />of the Standard Specifications, as may be amended by the Special Provisions, until the work is <br />physically complete.