Laserfiche WebLink
Compensation: <br />Project will be billed hourly not to exceed. <br />Total compensation will be as follows: <br />Additional Design, Bid, and Construction Support Services for Edgewater Park $153,172.00 <br />Design Contingency (10%) $ 31,220.00 <br />Total Not to Exceed $184,392.00 <br />Contingency may be used for issues that surface during the project ONLY as approved in <br />writing by the authorized City representative. <br />