My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3618 W MUKILTEO BLVD B HARBORS EDGE TOWNHOMES 2025-07-17
>
Address Records
>
W MUKILTEO BLVD
>
3618
>
HARBORS EDGE TOWNHOMES
>
3618 W MUKILTEO BLVD B HARBORS EDGE TOWNHOMES 2025-07-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2025 3:52:18 PM
Creation date
5/8/2025 2:13:08 PM
Metadata
Fields
Template:
Address Document
Street Name
W MUKILTEO BLVD
Street Number
3618
Unit
B
Tenant Name
HARBORS EDGE TOWNHOMES
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: B2304-034 Description: NEW"HARBOR'S EDGE"TOWNHOMES, UNIT B <br /> Applied:4/10/2023 Approved: 11/2/2023 Site Address: 3618 W MUKILTEO BLVD UNIT B <br /> Issued: 11/13/2023 Finaled:9/16/2024 City,State Zip Code: EVERETT,WA 98203 <br /> Status: FINALED Applicant:SAGE HOMES NORTHWEST LLC <br /> Parent Permit: PW2205-022 Owner:SAGE HOMES NORTHWEST LLC <br /> Parent Project: REV1122-001 Contractor:SAGE HOMES NORTHWEST LLC <br /> Details: <br /> "FIRE SUPPRESSION REQUIRED"PLANNING FINAL BEFORE BUILDING FINAL" <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> BLDG 15-OTHER BLDG INSPECTOR ACCEPTED Height Survey required at framing <br /> stage <br /> Notes: <br /> Height Survey required at framing stage <br /> 11/29/2023 11/30/2023 BLDG 02- RAKEEB KHAN PARTIAL <br /> FOOTING/SETBACK APPROVAL <br /> Notes: <br /> Thickened footing rebar not in place and will be inspected before slab pour. <br /> 11/29/2023 11/30/2023 BLDG 04-UFER RAKEEB KHAN APPROVAL <br /> GROUND <br /> Notes: <br /> 12/7/2023 12/7/2023 BLDG 03- RAKEEB KHAN APPROVAL <br /> FOUNDATION WALL <br /> Notes: <br /> BLDG 06- <br /> 2/22/2024 2/22/2024 UNDERSLAB RAKEEB KHAN APPROVAL <br /> INSULATION <br /> Notes: <br /> 4/9/2024 4/9/2024 BLDG 10-DRYWALL RAKEEB KHAN PARTIAL <br /> NAILING APPROVAL <br /> Notes: <br /> Exterior denseglass ok <br /> 4/17/2024 4/17/2024 BLDG 11-INTERIOR RAKEEB KHAN PARTIAL <br /> SHEAR APPROVAL <br /> Notes: <br /> shear at party walls at location of furred wall for plumbing/electrical. <br /> I <br /> Printed:Thursday, 19 September,2024 1 of 3 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.