Laserfiche WebLink
VERETT <br />0 <br />Permit Number: P2312-018 <br />Applied: 12/11/2023 <br />Issued:1/18/2024 <br />Status: FINALED <br />Parent Permit: B2304-035 <br />Parent Project: <br />Details: <br />New Plumbing <br />Permit Inspections <br />City of Everett <br />Approved:12/12/2023 <br />Finaled: 8/22/2024 <br />Description: Plumbing FOR NEW TOWNHOME HARBOR'S EDGE UNIT C <br />Site Address: 3618 W MUKILTEO BLVD UNIT C <br />City, State Zip Code: EVERETT, WA 98203-1248 <br />Applicant: JBAR PLUMBING LLC <br />Owner: SAGE HARBORS EDGE LLC <br />Contractor: JBAR PLUMBING LLC <br />SCHEDULED DATE <br />COMPLETED DATE TYPE <br />INSPECTOR <br />RESULT <br />REMARKS <br />PLUMB 02- <br />1/19/2024 <br />1/19/2024 GROUND <br />JASON <br />APPROVAL <br />see notes <br />WORK/SLAB <br />MORRISSEY <br />Notes: <br />1/18/2024 12:38 PM JBAR PLUMBING LLC <br />Contact Name: JBAR PLUMBING LLC <br />Site Address: 3618 W MUKILTEO BLVD UNIT C <br />Phone:4255011159 <br />e-Mail: javier@jbarplumbing.com <br />- Rough under slab DWV and water main ok. <br />5/8/2024 <br />5/8/2024 <br />PLUMB 03-ROUGH <br />JASON <br />CORRECTION <br />see notes <br />IN <br />MORRISSEY <br />REQUIRED <br />Notes: <br />- No test pressure on water distribution system. <br />5/13/2024 <br />F5/13/2024 <br />PLUMB 03-ROUGH <br />JASON <br />gppROVAL <br />see notes <br />IN <br />MORRISSEY <br />Notes: <br />- Rough DWV and water ok. <br />8/16/2024 <br />8/16/2024 <br />PLUMB 08-FINAL** <br />JASON <br />CORRECTION <br />see notes <br />MORRISSEY <br />REQUIRED <br />Notes: <br />- Downstairs bath shower and 3rd floor tub/shower bath escutcheon is not caulked to surround per UPC 402.2.- 3rd floor master bath Right Hand lav <br />pop up drain leaking at connection to sink. <br />8/21/2024 <br />8/21/2024 <br />PLUMB 08-FINAL** <br />JASON <br />CORRECTION <br />see notes <br />MORRISSEY <br />REQUIRED <br />Notes: <br />- Previous corrections are incomplete.(Corrections from 8/16/24)- Downstairs bath shower and 3rd floor tub/shower bath escutcheon is not caulked to <br />surround per UPC 402.2.- 3rd floor master bath Right Hand lav pop up drain leaking at connection to sink <br />I <br />Printed: Friday, 09 May, 2025 1 of 2 rk <br />SUPERION <br />