Laserfiche WebLink
9A ---- ---- A500 9A --------- A500 \I <br /> OHNSON BRAUND- <br /> N 15200 52nd Ave.South <br /> y Suite 300 <br /> 9A Seattle,WA 98188 <br /> ATTIC-------- <NOSTORAGE <br /> --- - Phone 206.766.8300 <br /> NO STORAGE vmvjonnsonnrauntl.wmPROVIDE DRY ARCHITECTURE <br /> SPRINKLER TYPICAL ROOFICEILING ASSEMBLY-1 HOUR SPRINKLER TYPICAL ROOFICEILING ASSEMBLY-1 HOUR INTERIOR DESIGN <br /> SYSTEM I COMPOSITION SHINGLE ROOFING SYSTEM I COMPOSITION SHINGLE ROOFING L.Allwine, <br /> ROOF UNDERLAYMENT,ICE&WATER SHIELD ROOF UNDERLAYMENT,ICE&WATER SHIELD Greg Grag L A.Williams, <br /> ROOF SHEATHING PER STRUCTURAL ROOF SHEATHING PER STRUCTURAL <br /> PRE-MANUFACTURED ROOF TRUSSES @ 24"O.C. PRE-MANUFACTURED ROOF TRUSSES @ 24"O.C. <br /> R49 BATT INSULATION R-49 BATT INSULATION <br /> CATWALK 1/2"RESILIENT CHANNELS @ 24"O.C. 1/2"RESILIENT CHANNELS @ 24"O.C. <br /> 5/8"TYPE'X'GWB,PAINTED @ BOTTOM FACE OF CATWALK5/8"TYPE'X'GWB,PAINTED @ BOTTOM FACE OF <br /> ASSEMBLY ASSEMBLY <br /> TOP PLATE <br /> "z Nyyh�N <br /> TOP OF PLATE TOP OF PLATE <br /> TYPICAL ROOF/CEILING ASSEMBLY-1 HOUR 7C <br /> A500 COMPOSITION SHINGLE ROOFING 7C 7C 7C <br /> �6 <br /> ROOF UNDERLAYMENT,ICE&WATER SHIELD REGISTERED <br /> o: ROOF SHEATHING PER STRUCTURAL o I I ARCHITECT <br /> PRE-MANUFACTURED ROOF TRUSSES @ 24"O.1e. 6 <br /> R-49 BATT INSULATION F <br /> 1/2"RESILIENT CHANNELS @ 24"O.C. O <br /> 5/8"TYPE'X GWB,PAINTED @ BOTTOM FACE OIFu. F e"T.AT'ly <br /> ASSEMBLY wnsxlxcTox <br /> ¢ ¢ —P <br /> 8D <br /> TOP OF GYPCRETE/LVL 6 <br /> SD 8C 8D SD 8C 8D - <br /> TOP OF SUBFLOOR TOP OF SUBFLOOR <br /> o <br /> 7D <br /> R <br /> R <br /> SEAL FIRST LAYER OF GWB TO TOP <br /> PLATE(TYP.) 7C 7C 7C <br /> NOTE:LEVEL 5 NOT SHOWN a Q <br /> O O <br /> 0 0 <br /> a <br /> 10 <br /> 8D A500 w w <br /> TOP OF GYPCRETE/LVL 4 <br /> SD I 8C 8D SD I 8C 8D <br /> _ TOP OF SUBFLOOR _ TOP OF SUBFLOOR <br /> e <br /> 7D <br /> K = = O <br /> O <br /> � 7C 7C 7C 7C <br /> TYPICAL FLOORICEILING ASSEMBLY-1 HOUR u <br /> FLOOR FINISH MATERIAL <br /> of GYPCRETE To <br /> OO SOUND CONTROL MAT @ HARD FINISH AREAS O TYPICAL FLOOR/CEILING ASSEMBLY-1 HOUR TYPICAL FLOORICEILING ASSEMBLY-1 HOUR <br /> FLOOR SHEATHING PER STRUCTURAL FLOOR FINISH MATERIAL FLOOR FINISH MATERIAL <br /> w FLOOR FRAMING PER STRUCTURAL O GYPCRETE TOPPING p GYPCRETE TOPPING <br /> U SOUND CONTROL INSULATION ~ SOUND CONTROL MAT @HARD FINISH AREAS- SOUND CONTROL MAT @ HARD FINISH AREAS p <br /> a 1/2"RESILIENT CHANNELS @ 24"O.C. a FLOOR SHEATHING PER STRUCTURAL p FLOOR SHEATHING PER STRUCTURAL rc <br /> 5/8"TYPE'X'GWB,PAINTED @ BOTTOM FACE OF FLOOR FRAMING PER STRUCTURAL O FLOOR FRAMING PER STRUCTURAL o <br /> ASSEMBLY SOUND CONTROL INSULATION LL SOUND CONTROL INSULATION <br /> 8D 1/2"RESILIENT CHANNELS @ 24"O.C. 1/2"RESILIENT CHANNELS @ 24"O.C. <br /> TOP OF GYPCRETE/LVL 3 5/8"TYPE'X'GWB,PAINTED @ BOTTOM FACE OF 5/8"TYPE'X'GWB,PAINTED @ BOTTOM FACE OF zo <br /> SD 8C gD ASSEMBLY 8D 8C 8D ASSEMBLY1. <br /> TOP OF SUBFLOOR TOP OF SUBFLOOR <br /> g 7D = - <br /> ry <br /> p g� <br /> O m m <br /> TYPICAL DEMISING WALL ASSEMBLY-1 HOURT ;d <br /> O 5/8'TYPE'X'GWB,PAINTED @ FACE OF STUD OO OO €o <br /> DOUBLE-STUD WALL FRAMING PER STRUCTURALS z <br /> p 1"AIR GAP O 3 LL <br /> O 3 1/2"BATT INSULATION IN BOTH STUD CAVITIES c"� <br /> 0'- 5/8"TYPE W GWB PAINTED @ FACE OF STUD y d rn <br /> w'a�i p <br /> TOP OF CONCRETE/LVL 2 ` w' " rc <br /> SD 8C 8D SD 8C 8D /0� .. a O N o3 <br /> - - _ _ TOP OF SUBFLOOR soV <br /> TOP OF SUBFLOOR <br /> w Q.o L c¢ i <br /> axi L o ¢Ewe az <br /> w'Z = <br /> Z o- <br /> 0 Z` <br /> LL oLL�m <br /> I <br /> ul 5'-3" <br /> z <br /> C O <br /> rn <br /> O w TYPICAL SLAB ON GRADE ASSEMBLY <br /> K <br /> 0 ww CONCRETE SEALER <br /> U r< 4"CONCRETE SLAB PER STRUCTURAL - I TYPICAL SLAB ON GRADE ASSEMBLY TYPICAL SLAB ON GRADE ASSEMBLY <br /> O VAPOR BARRIER <br /> 3 O CONCRETE SEALER CONCRETE SEALER <br /> 4"CAPILLARY BREAK LAYER PER 7C 7C 4"CONCRETE SLAB PER STRUCTURAL 7C 7C 4"CONCRETE SLAB PER STRUCTURAL <br /> LL GEOTECHNICAL REPORT <br /> N O - VAPOR BARRIER VAPOR BARRIER <br /> 4"CAPILLARY BREAK LAYER PER 4"CAPILLARY BREAK LAYER PER <br /> �2 a GEOTECHNICAL REPORT GEOTECHNICAL REPORT <br /> y <br /> c I I <br /> I I <br /> O PROJECT#: 1827 <br /> 0 <br /> N 2A DRAWN BY: AT,ST <br /> g T.O.C. _ _ CHECKED BY: ST <br /> ` ,__ 26 2B 2B 2B 2B 2B <br /> yo o T.O.C. T.O.C. <br /> _I I 1T-S�-1TI -1II1-=11I--III-=111111-=1 I <br /> t <br /> WALL SECTIONS <br /> .=== =I= <br /> GARAGE GARAGE A4 6 2 <br /> Z \ ' PERMIT SET 10/09/2020 <br /> w �3 \TYPICAL DEMISING WALL SECTION /2\TYPICAL CORRIDOR WALL SECTION a(�DOOR DROPS ���TYPICAL CORRIDOR WALL SECTION <br /> 1/2"=1'-0" 1/2"=T-0" <br />