My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3620 W MUKILTEO BLVD E HARBORS EDGE TOWNHOMES 2025-08-13
>
Address Records
>
W MUKILTEO BLVD
>
3620
>
HARBORS EDGE TOWNHOMES
>
3620 W MUKILTEO BLVD E HARBORS EDGE TOWNHOMES 2025-08-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2025 11:28:00 AM
Creation date
5/9/2025 3:07:38 PM
Metadata
Fields
Template:
Address Document
Street Name
W MUKILTEO BLVD
Street Number
3620
Unit
E
Tenant Name
HARBORS EDGE TOWNHOMES
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BTL <br />ENGINEERING <br />SPECIAL INSPECTION -INTERIOR SHEAR <br />Date: October 11, 2024 <br />To: Sage Homes <br />Attn: Kayla Cutting <br />From: Ryan Hartman, P.E. <br />Project: Harbors Edge Townhomes Pages: 1 <br />8-Plex <br />19011 Wood-Sno Road NE, Suite 100 <br />Woodinville, WA 98072-4436 <br />Phone: (425) 814-8448 <br />Fax: (425) 821-2120 <br />BTL Engineering has performed periodic Special Inspection as required by the City of Everett for shear walls with edge <br />nailing at 4" on center or less for the above -mentioned project. Interior shear inspection was conducted by photos <br />provided by the project superintendent from Sage Homes. The superintendent has confirmed the photos provided are for <br />the building listed above. The following Special Inspection Report includes a summary of our site visit. <br />Construction Documents: <br />❑ Construction set dated 01/26/2024 <br />Progress of construction: <br />❑ Date of inspection (virtual):10/11/2024 <br />❑ Foundation completed <br />❑ Framing completed <br />Items observed: <br />3rd Floor Walls: <br />❑ No interior walls with interior shear nailing less than 6" oc. No Special Inspection required. <br />2nd Floor Walls: <br />❑ No interior walls with interior shear nailing less than 6" oc. No Special Inspection required. <br />1st Floor Walls: <br />❑ No interior walls with interior shear nailing less than 6" oc except for P2-2 walls at garage side. (All units) <br />o Edge Nailing and Sheathing Splices: Construction Conforms to plan set. <br />Give me a call if you have any questions or comments. <br />Sincerely, <br />Ryan Hartman, P.E. <br />BTL Engineering <br />
The URL can be used to link to this page
Your browser does not support the video tag.