My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2429-99
>
Ordinances
>
Ordinance 2429-99
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2014 4:03:28 PM
Creation date
3/27/2014 4:03:27 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2429-99
Date
12/15/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
installations not covered above <br /> Plan Reviews On Plan Approval .4% (.004) of Public <br /> Works approved <br /> engineers estimate, <br /> $20 minimum <br /> Inspection On Permit Issuance 2.5% (.025) of Public <br /> Works approved <br /> engineers estimate. <br /> $20 minimum) <br /> Approval/Permit Extension <br /> The fee(s) for resubmittal of plans for approval extension and/or permit extension <br /> will be one-half(1/2)the applicable fees noted above. Extension fees do not apply <br /> to the 2.5% inspection fee. <br /> Inspection Fee Refund <br /> The 2.5% inspection fee is refundable, less $20 to cover permit close out costs, if <br /> no site activity has began. <br /> Be and the same is hereby amended to read as follows: <br /> Payment <br /> Permit Activity Balance Due Fee <br /> Review Erosion Control Plans <br /> Commercial/Industrial On Plan Approval $ 200 <br /> Subdivision On Plan Approval $ 150+ $10/lot <br /> Short Subdivision On Plan Approval $ 50+ $10/lot <br /> Other On Plan Approval $ 50 <br /> Install New Driveway Access <br /> to Public Right-of-Way <br /> Asphalt Apron (applicable only <br /> where no C & G improvements <br /> exist or none is required) On Permit Issuance $25 any code <br /> size <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.