My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active LLC 5/9/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
Always Active LLC 5/9/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2025 9:06:33 AM
Creation date
5/14/2025 9:04:19 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active LLC
Approval Date
5/9/2025
Council Approval Date
5/7/2025
End Date
11/6/2024
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Final Acceptance of Citywide Bicycle Wayfinding
Public Works WO Number
PW 3786
Tracking Number
0004034
Total Compensation
$340,318.05
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
PROJECT <br />JOB NUMBER <br />FEDERAL AID NUMBER NA <br />STATE FUND NUMBER: <br />CONTRACT BID AMOUNT (excludes WSST) <br />Prime Contractor: Always Active 604594690 NA Yes No Yes NA NA 64925 8/5/2022 1420008 4/24/2024 <br />1368538 12/23/2024 <br />Req <br /># Subcontractor UBI # Amount This % <br />Prior <br />% <br />% To <br />Date <br />Return <br />Date <br />FED <br />CERT DBE MBE WBE <br />DBE ONSITE <br />INTERVIEW <br />WAGE <br />RATE <br />INTERVIEW COEBL <br />DATE <br />RECEIVED <br />L&I <br />Intent Date <br />L&I <br />Affidavit Date <br />1 Specialized Pavement Markings (SPM)602001003 $142,882.00 39.349 0.00 39.349 3/27/2024 NA NA NA NA NA NA 55302 3/2/2016 1428524 5/15/2024 1375638 1/7/2025 <br />2 Method Traffic Control 604744529 $20,075.00 5.529 39.349 44.88 5/23/2024 NA NA NA NA NA NA 64146 1/25/2022 1428513 5/23/2024 1369302 3/11/2025 <br /> <br />Vendors, Suppliers, Services <br />1 <br />TOTAL $162,957.00 <br />CHECKED DATE 3/27/2025 <br />$363,113.00 <br />SUBCONTRACTOR TRACKING LOG <br />WO PW-3786 <br />Citywide Bicycle Wayfinding <br />HLP-PB21(014) <br />S:\1Common\ENGINEERING PROJECTS\3786 CITYWIDE BICYCLE WAYFINDING\700 CONSTRUCTION MANAGEMENT\00-PW3786-Central Records\0.9-Closeout Docs\Subcontractor Tracking Log_Citywide Bicycle Wayfinding
The URL can be used to link to this page
Your browser does not support the video tag.