My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
701 75TH ST SE BLDG 9 SHORESIDE VILLAGE 2018-01-02 MF Import
>
Address Records
>
75TH ST SE
>
701
>
SHORESIDE VILLAGE
>
701 75TH ST SE BLDG 9 SHORESIDE VILLAGE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2025 3:52:07 PM
Creation date
5/15/2025 3:13:38 PM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SE
Street Number
701
Unit
BLDG 9
Tenant Name
SHORESIDE VILLAGE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 8/5/2022 8/5/2022 BLDG 16-FINAL KURT KECK NOT READY eTRAKiT Inspection Request <br /> Notes: <br /> 8/1/2022 1:52 PM WRIGHT WAY CONSTRUCTION LLC <br /> Final for units 921,922,945 <br /> Call 425-877-0250 <br /> Contact Name:WRIGHT WAY CONSTRUCTION LLC <br /> Site Address:701 75TH ST BLDG 9 <br /> Phone:4258770250 <br /> e-Mail:wwcllc05O6@gmail.com <br /> 8/9/2022 8/9/2022 BLDG 16-FINAL KURT KECK PARTIAL Units 921,922,945 ok final <br /> APPROVAL <br /> Notes: <br /> 8/5/2022 2:17 PM WRIGHT WAY CONSTRUCTION LLC <br /> Final on units 921,922,and 945 <br /> Call 425-877-0250 <br /> Contact Name:WRIGHT WAY CONSTRUCTION LLC <br /> Site Address:701 75TH ST BLDG 9 <br /> Phone:4258770250 <br /> e-Mail:wwcllc05O6@gmail.com <br /> 8/12/2022 8/12/2022 BLDG 16-FINAL KURT KECK PARTIAL eTRAKiT Inspection Request <br /> APPROVAL <br /> Notes: <br /> 8/8/2022 1:36 PM WRIGHT WAY CONSTRUCTION LLC <br /> Final for units 911,912,915,916,923,935 <br /> Call 425-877-0250 <br /> Contact Name:WRIGHT WAY CONSTRUCTION LLC <br /> Site Address:701 75TH ST BLDG 9 <br /> Phone:4258770250 <br /> e-Mail:wwcllc05O6@gmail.com <br /> (8/12/2022 2:52 PM KMK) <br /> Unit 916 still needs plumbing and electrical final. <br /> Units 911,912,915,923,935 ok final <br /> 8/18/2022 8/18/2022 BLDG 16-FINAL KURT KECK PARTIAL unit 915,923 ok final <br /> APPROVAL <br /> Notes: <br /> 8/16/2022 10:30 AM WRIGHT WAY CONSTRUCTION LLC <br /> Final on units 915,916 and 923 <br /> Call 425-877-0250 <br /> Contact Name:WRIGHT WAY CONSTRUCTION LLC <br /> Site Address:701 75TH ST BLDG 9 <br /> Phone:4258770250 <br /> e-Mail:wwcllc05O6@gmail.com <br /> I <br /> Printed: Friday, 14 June, 2024 3 of 5 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.