Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 1/23/2023 1/23/2023 BLDG 16-FINAL KURT KECK CORRECTION eTRAKiT Inspection Request <br /> REQUIRED <br /> Notes: <br /> 1/19/2023 4:23 PM WRIGHT WAY CONSTRUCTION LLC <br /> Contact Name:WRIGHT WAY CONSTRUCTION LLC <br /> Site Address:701 75TH ST BLDG 9 <br /> Phone:4258770250 <br /> e-Mail:wwcllc0506@gmail.com <br /> 1.Schedule and obtain electrical final.2. Reschedule for building final when ready. <br /> 3/21/2023 3/21/2023 BLDG 16-FINAL KURT KECK APPRVD-PERMIT eTRAKiT Inspection Request <br /> FINAL <br /> Notes: <br /> 3/15/2023 1:04 PM WRIGHT WAY CONSTRUCTION LLC <br /> Contact Name:WRIGHT WAY CONSTRUCTION LLC <br /> Site Address:701 75TH ST BLDG 9 <br /> Phone:4258770250 <br /> e-Mail:wwcllc0506@gmail.com <br /> I <br /> Printed: Friday, 14 June, 2024 5 of 5 <br /> SUPERION <br />