Laserfiche WebLink
To: City Of Everett Department Transit COP #: 03 <br />3201 Smith Avenue Suite 215 Everett WA 98201 Date:9/24/2024 <br /> Inductive Charging Infrastructure Attn: <br />Project:23-08 CHG Inductive Charging Infrastructure For Field Installation <br />Description: <br />The below cost is for the policy extension from 09/30/24 – 03/01/25 (Cal. Days = 152): <br />Builders Risk, as required per (00 7200-53) 15.3.14.2 <br />Authored By: Peter Uzunov <br />Cost Breakdown: <br />Labor:Hours Rate Item Total <br />Project Manager 3 85.00$ 255.00$ <br />Labor - -$ -$ <br />Material & Equipment:Qty. Cost Item Total <br />Propel Insurance 1 1 2,983.00$ 2,983.00$ <br />- -$ -$ <br />- -$ -$ <br />Cost Summary:Amount: <br />Labor:255.00$ <br />Material & Equipment:2,983.00$ <br />Subtotal:3,238.00$ <br />Overhead:10.0%323.80$ <br />Profit:5%178.09$ <br />COP Total:3,739.89$ <br />Total does not include WA State Sales Tax <br />Work will not proceed until this COP is included in an executed change order updating the contract price. <br />This COP:3,739.89$ <br />Other Pending COP's:22,355.65$ <br />Total Pending COP's:26,095.54$ <br />Authorized Signature:Date: <br />Owner or Owner's Representative <br />Authorized Signature: Date: <br />Valdez Construction, Inc. <br />Reservation of Rights. This change order proposal is based solely on direct cost elements such as labor, material, and normal markups, and <br />does not include any amount for changes in the sequence of work, delays, disruption, rescheduling, extended overhead acceleration, and/or <br />impact costs which are not possible to assess at the present time. Right is expressly reserved to make claim for any and all of these <br />related items of compensable cost overrun prior to final settlement of this Contract. <br />Change Order Proposal <br />499 NE Midway Blvd. Ste. 2, Oak Harbor, WA 98277 <br />Phone: (360) 679-3000 Fax: (360) 679-2589