My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/04/30 Council Agenda Packet (2)
>
Council Agenda Packets
>
2025
>
2025/04/30 Council Agenda Packet (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2025 7:49:07 AM
Creation date
5/16/2025 7:45:54 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/30/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
z <br />Equipment <br />$157,799.00 <br />Installation <br />$76,500.00 Safety Surfacing <br />$243,454.20 <br />Sitework <br />$47,734.05 <br />Freight <br />$12,510.… <br />Sales Tax $50,140.37 <br />Concept <br />C.2 <br />SCOPE COST BREAKDOWN <br />INSTALLATION <br />Play Equipment Deluxe Installation by our locally based factory trained installation <br />crew. <br />All footings to be dug through dirt/earth sub base. If there are concrete or other <br />surfaces present in the installation area additional charges will be required. <br />PLAY EQUIPMENT <br />All Play Equipment is manufactured to order at our employee owned facility in <br />Delano, Minnesota. <br />SITEWORK/DEMOLITION <br />Demolition and disposal of all existing play equipment in both play areas shown in <br />drawing# 1188890-03-02 <br />All existing Wood Chip surfacing to be removed and disposed of in a location <br />approved by client onsite, to be reused elsewhere by others. <br />All footings to be dug through dirt/earth sub base. If there are concrete or other <br />obstructions present in the installation area additional charges will be required. <br />Play Equipment Ships from Delano, MN to Jobsite location unless otherwise <br />specified. <br />SALES TAX/BONDS <br />Sales tax was calculated based on project location and tax rate at time of order. <br />A performance bond has been included as part of this scope of work. <br />Click Here to view Landscape Structures Product Warranty <br />This quote was compiled utilizing Prevailing Wage requirements. <br />This quote includes a Performance Bond but may be removed and a new worksheet total can be issued upon request. <br />PROUDLY Representing: <br />Lowell Park Playground <br />Quote / Worksheet #2409-12463-03-02 <br />To: <br />City of Everett Parks & Facilities <br />802 E Mukilteo Blvd <br />Everett, WA 98203 <br />Lolly Huggins| Capital Projects Coordinator <br />LHuggins@everettwa.gov | 425.626.3605 <br />Project Location: <br />Lowell Park <br />4605 S. 3rd St. <br />Everett, WA 98203 <br />SAFETY SURFACING <br />ForeverLawn PlaygroundGrass Ultra 2" PlayPadPro Envirofill Infill per product <br />specifications. Composite edge nailer boards. All associated and required items that <br />accompany this (seaming tape, etc.) includes installing the safety pad, trimming around <br />existing structures and obstacles, seaming of product and edging, manufactured and <br />installed by our partners at ForeverLawn. This total includes all freight associated with the <br />delivery of the product. <br />Total shown includes the material and instalation for the Crushed Rock Sub base <br />Click Here to view ForeverLawn's Product Warranty <br />FREIGHT
The URL can be used to link to this page
Your browser does not support the video tag.