My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/16/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 5/16/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2025 11:04:07 AM
Creation date
5/16/2025 9:53:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/16/2025
Council Approval Date
5/7/2025
Department
Public Works
Department Project Manager
Dan Erico
Subject / Project Title
2025 PAVEMENT MAINTENANCE OVERLAY
Public Works WO Number
COE PW WO# 3830
Tracking Number
0004830
Total Compensation
$1,327,733.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Granite Construction Company 8/25/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 Pavement Maintenance Overlay BID PROPOSAL: BID ITEM TABLE <br />PW# 3830 March 26, 2025 <br />Note: Unit prices for all items, all extensions, and the total amount bid must be shown. Where conflict occurs between the <br />unit price and the total amount named for any item, the unit price shall prevail, and totals shall be corrected to conform <br />thereto. All entries must be typed or entered in ink. <br />BID SCHEDULE 2025 Pavement Maintenance Overlay WO# 3830 <br />BIDDER:____________________________ <br />Item <br />No.ITEM DESCRIPTION Unit Bid <br />Qty UNIT PRICE TOTAL AMOUNT <br /> <br />1 Mobilization LS 1 $_______.___$______________.___ <br />2 Flaggers (Minimum Bid Prevailing Wage)Hour 1,058 $_______.___$______________.___ <br />3 Uniformed Police Officer Hour 160 $_______.___$______________.___ <br />4 Project Temporary Traffic Control LS 1 $_______.___$______________.___ <br />5 Portable Changeable Message Sign Hour 1,382 $_______.___$______________.___ <br />6 Planing Bituminous Pavement SY 43,725 $_______.___$______________.___ <br />7 Additional Planing Bituminous Pavement SY 6,558 $_______.___$______________.___ <br />8 HMA Class 1/2 Inch, PG 64-22 Ton 5,857 $_______.___$______________.___ <br />9 Street Cleaning HR 90 $_______.___$______________.___ <br />10 Adjust Manhole Each 12 $_______.___$______________.___ <br />11 Adjust Catch Basin/Inlet to Grade Each 21 $_______.___$______________.___ <br />12 Adjust Valve Box to Grade Each 28 $_______.___$______________.___ <br />13 Adjust Existing Monument Castings to Grade Each 3 $_______.___$______________.___ <br />14 Plastic Wide Line LF 100 $_______.___$______________.___ <br />15 Plastic Line LF 38,760 $_______.___$______________.___ <br />16 Plastic Traffic Arrow Each 1 $_______.___$______________.___ <br />17 24 Plastic Crosswalk Line SF 7 $_______.___$______________.___ <br />18 24 Plastic Stop Line LF 118 $_______.___$______________.___ <br />19 Raised Pavement Markers, Type 2 Hund 4 $_______.___$______________.___ <br />20 Temporary Pavement Markings LF 24,500 $_______.___$______________.___ <br />21 Vehicle Loop Detectors LF 800 $_______.___$______________.___
The URL can be used to link to this page
Your browser does not support the video tag.