Laserfiche WebLink
CITY OF EVERETT, WASHINGTON <br />CONTRACT PROVISIONS FOR <br />WORK ORDER NO.: PW 3830 <br />2025 PAVEMENT MAINTENANCE OVERLAY INSTRUCTIONS TO BIDDERS <br />PW# 3830 1 March 26, 2025 <br />INSTRUCTIONS TO BIDDERS <br />1.0 Design Engineer <br />Questions and inquiries about these Contract Provisions should be directed to the attention of Gina <br />Loring, (425) 257-7290 or gloring@everettwa.gov. <br />2.0 Bidders Check List <br />The bidders attention is directed to the following City-provided forms which must be executed in full <br />and submitted with the bid as required: <br />1.Proposal: The lump sum and unit price items must be shown in the space provided. Show <br />unit prices in figures. <br />2.Proposal Signature Sheet: To be filled in and signed by the Bidder. <br />3.Local Agency Subcontractor List (DOT Form 271-15A Rev 06/2020): To be filled in by the <br />Bidder. <br />4.RCW 35.22.650 Certification: To be filled in and signed by the bidder. <br />5.Non-Collusion Declaration: To be submitted with the bid. <br />6.Bid Bond: This form provided by the City is to be executed by the Bidder and the surety <br />company unless bid is accompanied by a certified check or cashiers check. The amount of <br />this bond shall be not less than five percent (5%) of the total amount bid and may be shown <br />in dollars or on a percentage basis. Cash will not be accepted. <br />7.Proposal For Incorporating Recycled Materials Into The Project: To be filled in and signed by <br />the bidder. <br />Failure to complete the aforementioned forms and to submit the forms with the bid as required may <br />be due cause for rejection of bid. <br />All protests by Bidders must be in accordance with Chapter 3.46 of the Everett Municipal Code, Bid <br />Protest Procedures. <br />3.0 Pre-Award Forms <br />The following form is required to be signed and submitted prior to award of Contract: <br />1.Certification of Compliance with Wage Payment Statutes: To be filled in and signed. This <br />certification is not required to be submitted with the bid proposal and may be submitted after <br />bid opening. The Contract cannot be awarded without this certification. <br />4.0 Contract Forms <br />The following forms are to be executed and/or delivered after the award of Contract: