My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/16/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 5/16/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2025 11:04:07 AM
Creation date
5/16/2025 9:53:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/16/2025
Council Approval Date
5/7/2025
Department
Public Works
Department Project Manager
Dan Erico
Subject / Project Title
2025 PAVEMENT MAINTENANCE OVERLAY
Public Works WO Number
COE PW WO# 3830
Tracking Number
0004830
Total Compensation
$1,327,733.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Granite Construction Company 8/25/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
APWA-WA Division 1 Committee rev. 5/13/2022 <br />Proposal for Incorporating Recycled Materials into the Project <br />In compliance with RCW 70A.205.700, the Bidder shall propose below, the total percent of <br />construction aggregate and concrete materials to be incorporated into the Project that are <br />recycled materials. Calculated percentages must be within the amounts allowed in Section <br />9-03.21(1)E, Table on Maximum Allowable Percent (By Weight) of Recycled Material, of the <br />Standard Specifications. <br />Proposed total percentage: _____________________________ percent. <br />Note: Use of recycled materials is highly encouraged within the limits shown above, but does <br />not constitute a Bidder Preference, and will not affect the determination of award, unless two or <br />more lowest responsive Bid totals are exactly equal, in which case proposed recycling <br />percentages will be used as a tie-breaker, per the APWA GSP in Section 1-03.1 of the Special <br />Provisions. Regardless, the Bidder’s stated proposed percentages will become a goal the <br />Contractor should do its best to accomplish. Bidders will be required to report on recycled <br />materials actually incorporated into the Project, in accordance with the APWA GSP in Section <br />1-06.6 of the Special Provisions. <br />Bidder: <br />Signature of Authorized Official: <br />Date:
The URL can be used to link to this page
Your browser does not support the video tag.