My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/16/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 5/16/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2025 11:04:07 AM
Creation date
5/16/2025 9:53:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/16/2025
Council Approval Date
5/7/2025
Department
Public Works
Department Project Manager
Dan Erico
Subject / Project Title
2025 PAVEMENT MAINTENANCE OVERLAY
Public Works WO Number
COE PW WO# 3830
Tracking Number
0004830
Total Compensation
$1,327,733.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Granite Construction Company 8/25/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> <br /> <br /> <br /> ITEM DESCRIPTION YES NO <br /> <br />17. Precast Concrete Inlet - with adjustment sections, <br /> See Std. Plans X X <br />18. Precast Drop Inlet Type 1 and 2 with metal grate supports. <br /> See Std. Plans. X X <br />19. Precast Grate Inlet Type 2 with extension and top units. <br /> See Std. Plans X X <br />20. Metal frames, vaned grates, and hoods for Combination <br />Inlets. See Std. Plans X X <br />21. Precast Concrete Utility Vaults - Precast Concrete utility vaults <br />of <br />various sizes. Used for in ground storage of utility facilities and <br />controls. See Contract Plans for size and construction X X requirements. Shop drawings are to be provided for approval <br />prior to casting <br /> <br />22. Vault Risers - For use with Valve Vaults and Utilities <br /> <br />X X X Vaults. <br /> <br />23. Valve Vault - For use with underground utilities. X See Contract Plans for details. X <br />24. Precast Concrete Barrier - Precast Concrete Barrier for <br />use as new barrier or may also be used as Temporary Concrete <br />Barrier. Only new state approved barrier may be used as X X permanent barrier. <br /> <br />25. Reinforced Earth Wall Panels – Reinforced Earth Wall Panels in <br />size and shape as shown in the Plans. Fabrication plant has <br />annual approval for methods and materials to be used. <br />See Shop Drawing. X X Fabrication at other locations may be approved, after facilities <br />inspection, contact HQ. Lab. <br /> <br />26. Precast Concrete Walls - Precast Concrete Walls - tilt-up wall <br />panel in size and shape as shown in Plans. X X Fabrication plant has annual approval for methods and materials <br />to be used <br />Supplemental to Wage Rates 4 <br />3/5/2025 Edition, Published February 11, 2024
The URL can be used to link to this page
Your browser does not support the video tag.